Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.7 L+₹5.4 L (40.9%)Rejected-AOC YULKAM NOBRA | L2 | Rejected-AOC L2 | |
| 3 | L3₹18.8 L+₹5.5 L (41.0%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹18.8 L+₹5.5 L (41.4%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹22.8 L+₹9.5 L (71.7%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹19 L
EMD Value
₹38,000
Closing Date
16 Feb 2021, 4:00 pmClosed
Executive Engineer SSD Nobra
Office of the Executive Engineer SSD Nobra
Construction of link road to Youlkham village.under capex.
2021_PWD_2090_2
SSD/N/21 of 2020-21
Open Tender
Civil Works - Roads
Item Rate
60 days
Nobra
Please refer to tender document
4 documents required · 4 mandatory
₹1,000
Yes
Payable To Executive Engineer SSD Nobra
₹38,000
Yes
27 Mar 2021
28 Jan 2021
18 Feb 2021
29 Jan 2021
16 Feb 2021
29 Jan 2021
Amount
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil:
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Dry random rubble masonry with hard stone in foundation and plinth:Without bond stone
Random Rubble masonary laid in foundation and plinth using nallah stone wtth out bond stone in mud mortor.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) incl cost of cement carriage.
Centering and shuttering including strutting, propping etc. and removal of form work for: a. Foundations, footings, bases for columns
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete incl cost of cement carriage.
providing and laying of MS pipe for x-ing including trench excavation laying of pipe in proper slope refilling and making the surface good in carriage and cost of pipe complete job.(300mm dia).
Carriage of material by mechanical transport loading unloading complete job. a. Sand/stone agg avg lead 5km.
b. Stone avg lead 5km.
c.Earth an avg lead of 1km
M/S STANZIN GYATSO
M/S THENLAS DORJAY
M/S WANGCHUK SINGAY
M/S IBRAHIM ALI
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .