| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.3 LAccepted-Finance | L-1 | Accepted-Finance Admitted | |
| 2 | L-2₹2.4 L+₹15,000 (6.56%)Accepted-Finance | L-2 | Accepted-Finance Admitted | |
| 3 | L-3₹3.0 L+₹71,490 (31.3%)Accepted-Finance 19 A DURGA BARI SADAR BAZAR MEERUT MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | L-3 | Accepted-Finance Admitted | |
| 4 | L-4₹3.0 L+₹75,850 (33.2%)Accepted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | L-4 | Accepted-Finance Admitted | |
| 5 | L-5₹3.1 L+₹86,000 (37.6%)Accepted-Finance | L-5 | Accepted-Finance Admitted |
Tender Value
₹3.0 L
EMD Value
₹3,000
Closing Date
28 Apr 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle, 220 KV S/s Campus Natwa, Mirzapur
Installation of 40 MVA, 132/33 KV Transformer Technical Associate Make at 132/33 KV S/S Lalganj under ETD, Mirzapur
2023_UPTCL_793409_2
Short term T.No. 01/2023-24
Open Tender
Electrical Works
Fixed-rate
30 days
Lalganj Mirzapur
as per specification
2 documents required · 2 mandatory
₹590
Executive Engineer, ETD, Mirzapur
₹3,000
3 May 2023
15 Apr 2023
29 Apr 2023
15 Apr 2023
28 Apr 2023
15 Apr 2023
Amount
Dismantling of 120KV LA with structure by opening of jumpers, cutting of earthing to provide safe passage for shifting of T/F and re-erection of the same after dismantling of 20MVA and erection of 40 MVA T/F including of re-earthing of LA.
Dismantaling of existing 20MVA T/F by opening of jumpers, Earthing, Marshling box, cable connections etc. alongwith draining out transformer oil into 209 ltrs, capacity empty drums, removal of all radiators, conservator tank, oil pipe lines, all bushings, turrets fan motor, required quantity of oil from transformer ( Empty oil drums shall be provided by the department)
Shifting of main tank 20 MVA T/F from plinth to safe place (up to 20 meter distance) after opening of jumpers, cutting of earthing and opening of cable connection etc. including turning of tank if required, including all T&P and work required to complete the job satisfactorily.
Additional shifting of 70 meter (@ 5 Meter/job.)
Shifting of dismentaled HV bushing, radiator, all associated pipe at safe place or store & banking the same with suitable size Gasket and iron plate alongwith nut bolt to complete the job satisfactorily.
Shifting of main tank 40 MVA T/F from unloding point to plinth up to 20 meter distance including turning of tank if required, including all T&P and work required to complete the job satisfactorily.
Additional shifting of 200 meter (@ 5 Meter/job.)
Complete Erection of 40 MVA T/F by erection of radiators, conservator tank, all bushing with their turrets, connecting oil pipe, cooling fans, motor drive mechanism with tap changer, RTCC panel, and associated oil pipe line etc. to complete the job satisfactorily, including first filling of oil and topping up of T/F oil in tank, radiator pipe lines, conservator tank etc. and attending oil leakage, if any and all other associated work for satisfactory completion of work along with arrangement of labour and T&P to complete the job in all respect.( Hydra, crane, special tools, will be arranged by contractor.
Raising the height of 3 Nos. ALP structure for 30KV LA after dismantling of LA and structure and again its erection, replacement of all the Panther conductor, jumpering of 33KV sideof 40 MVA, 132/33KV T/F from 33KV Bushing to 33KV Bus Bar with ACSR Moose conductor, fixing of all the isolator clamps, CB clamps, LA clamps, CT clamps suitable for proper size of Moose conductor and jumpering of all the 33KV side equipment.
Dismantling of all cable connections of 20 MVA T/F and its RTCC panels, re-termination along with re-glanding and re-ferruling as per new cable schedule of 40 MVA T/F and its RTCC panels.
Laying & termination of new control cables for 40 MVA T/F from control and relay panel to marshelling box / equipment / JB etc. for new 40 MVA T/F as per cable schedule and inter-connection with control cable at marshalling box and OLTC panel to RTCC panel to each fan with re-ferruling and re-dressing with proper gland & ferrule etc as per drawing schedule.
Centrifuging of complete 40 MVA T/F oil in T/F & Tank by connecting Centrifuging pipes, circulating the T/F oil through centrifuging machine to be provided by the contractor & taking the BDV value of the oil periodically till the required value is achieved as per direction of supervising engineer, all T&P, labour, and centrifusing machine shall be provided by the contractor.
Earthing of erected 40 MVA T/F main tank, neutral bushing, marshaling box, OLTC, RTCC, panel etc at two points using 75x10/50x6mm. (MS flat and earthing electrodes shall be provided by the department free of cost), the work also includes painting of earthing strip with one coat of red oxide primer and two coat of bus green synthetic enameled paint.
U K S ENTERPRISES
Technocrat Electrical
Hi-tech power transmission
Meena Elect & Engg. Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .