Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | ₹15.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹16.0 L+₹40,081.17 (2.56%)Rejected-AOC | ₹16.0 L+₹40,081.17 (2.56%) | L2 | Rejected-AOC Rejected |
| 3 | L2₹16.0 L+₹40,081.17 (2.56%)Rejected-AOC WARD NO 16 PO PS DIST JAGATSINGHPUR | JAGATSINGHPUR | ₹16.0 L+₹40,081.17 (2.56%) | L2 | Rejected-AOC Rejected |
| 4 | L2₹16.0 L+₹40,081.17 (2.56%)Rejected-AOC AT NEHUR COLONY PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹16.0 L+₹40,081.17 (2.56%) | L2 | Rejected-AOC Rejected |
| 5 | L2₹16.0 L+₹40,081.17 (2.56%)Rejected-AOC | ₹16.0 L+₹40,081.17 (2.56%) | L2 | Rejected-AOC Rejected |
Tender Value
₹16.0 L
EMD Value
₹16,000
Closing Date
11 May 2026, 5:00 pmClosed
Executive Engineer, CD-II
At Bikash Bhawan, Jagannathlane, Badambadi, Cuttack 753012
Construction of Ward Office near Raghunath Jew Temple Telenga Bazar in Ward No. 28.
2026_ORULB_127815_5
MC(CMC)CTC_Div-II_No.3/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹16,000
Yes
3 Aug 2026
30 Apr 2026
14 May 2026
30 Apr 2026
11 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavtion of foundation in all kinds of soil within initial lead and lift including dressing and levelling the bed and depositing the soil as directed | 64.28 | Cum | 228.21 | ₹14,669.34 |
| 2 | Filling in foundation trenches, plinths, sites of foundation, in the space below the grade level slab and other underground structures with good quality river sand (inclusive of cost, conveyance, royalties, taxes, loading and unloading) laying in layers not exceeding 225mm in thickness, filling, watering and compacting ramming, in each layers or complete as per specification, drawing and direction of the Engineer-in-Charge | 17.92 | Cum | 798.9 | ₹14,316.29 |
| 3 | Cement concrete (1:3:6) with 4cm. Size crusher broken häard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete | 11.11 | Cum | 5,995.1 | ₹66,605.56 |
| 4 | Fly ash bricks of 25cmx12cmx8cm Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2% percentin cement mortar (1:6) in foundation and plinth | 4.48 | Cum | 5,033.8 | ₹22,551.42 |
| 5 | Providing Cement Concrete forR.C.C works of (M-20) using 20mm size down graded crusher broken hard granite (CBHG) stone chips of approved quality & from approved quarry on the road surface including cost of labour, materials (inclusive of cost, conveyance, royalties, taxes, loading & unloading) & equipments for handing, transportation, batching, mixing, placing in position /layers, vibrating, curing for 28 days complete as per specification drawing and direction of the Engineer-in-charge. A) R.C.C. FOUNDATION & COLUMN BASE. | 6.39 | Cum | 6,844.75 | ₹43,737.95 |
| 6 | R.C.C. PLINTH BEND | 4.35 | Cum | 7,666.31 | ₹33,348.45 |
| 7 | R.C.C. LINTELS | 1.26 | Cum | 13,903.58 | ₹17,518.51 |
| 8 | R.C.C. BEAM & COLUMN | 11.6 | Cum | 16,712.33 | ₹1,93,863.03 |
| 9 | R.C.C. ROOF SLAB | 9.07 | Cum | 13,261.82 | ₹1,20,284.71 |
| 10 | R.C.C. CHAJJA | 3.38 | Sqm | 1,166.63 | ₹3,943.21 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589256.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_589256.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .