| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.7 CrAWARDED | ₹1.7 Cr | AWARDED |
Tender Value
₹1.7 Cr
EMD Value
₹2.5 L
Closing Date
18 Jun 2025, 9:30 pmClosed
Public Works Department
Devolopment of Link roads to join from akkammabhavi line to Mallareddy line in ward No.4 and construction of roads and drain in ward No.23 Mahanadikottam in Ballari city of Ballari city constituency Ballari District under 2515-KKRDB (CMDQ projects) for the year 2024-25
PWD/2025-26/RD/WORK_INDENT21642
PWD/2025-26/RD/WORK_INDENT21642
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Ballari
₹4,200
₹2.5 L
6 Jun 2025
6 Jun 2025
19 Jun 2025
13 Jun 2025
10 Jun 2025
Devolopment of Link roads to join from akkammabhavi line to Mallareddy line in ward no.4 and construction of roads and drain in ward no 23 .Mahanadikottam in ballari city constituency,in Ballari.
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, arricading, caution lig...
Construction of Sub Grade and Earthen shouders
Construction of sub-grade and earthen shoulders with approved material Gravel/Murrum with all lifts & leads, transporting to site, spreading, grading to ...
Granular Sub-Base
A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in ...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carria...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), c...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, arricading, caution lig...
Providing and Laying in position plain cement concrete for levelling course for all works in foundation .The granite /trap/basalt curshed graded coarse aggregates and fine aggregates as per relevant I...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel appurtenances required to complete t...
Form work FOR RAFT 3 PERCENT ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineri...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking,laping/welding joints, tying...
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad...
Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply wired stee...
Repairs to Machinehole for different depths including removal of debris, levelling the brick masonry, construction of brick masonry upto Ground level, providing CC coping alround the MH cover, plaster...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing lowering laying, jointing, testing and commissioning of
following diameters glazed stone ware pipes, conforming to IS 651:1992, (with 5th revision) in all respects jointing with EPDM rubber...
Providing and constructing "WIRE CUT BRICK MACHINEHOLE CHAMBERS" using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved qu...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 ...
form WORK FOR SIDE WALL AT 35 PERCENT ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and ...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .