Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAdmitted-Finance | ₹24.3 L | L1 | Admitted-Finance |
| 2 | L2₹27.6 LAdmitted-Finance | ₹27.6 L | L2 | Admitted-Finance |
| 3 | L3₹28.0 LAdmitted-Finance PLOT NO 28 SANTOSHIMA COLONY WEST MARREDPALLY SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | ₹28.0 L | L3 | Admitted-Finance |
| 4 | L4₹29.0 LAdmitted-Finance | ₹29.0 L | L4 | Admitted-Finance |
| 5 | L5₹30.5 LAdmitted-Finance HOUSE NO 2 4 136 LINGREDDY MANSION BLOCK NO IV OPP HANUMAN TEMPLE TADBUND SECUNDERABAD 500009 | SECUNDERABAD | HYDERABAD | TELANGANA | 500009 | ₹30.5 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s K L M INFRATECH L4 | BHATNAGAR ASSOCIATES L2 | S.S.ENGINEERING CORPORATION L1 | Universal refrigeration and Engineering Company L3 | omsai thermax engineers L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Disconnecting and removing the un-serviceable TCPM board of chiller unit of 50 TO 95 TR Air cooled/ Water cooled AC plant, from the existing position, supply and fixing in repairs new TCPM Board all as specified and directed by Engr-in-Charge. | 2 | Each Job | 75,000 ₹1.5 L | 27,000 ₹54,000 | 50,000 ₹1 L | 69,000 ₹1.4 L | 81,000 ₹1.6 L |
| 2.00 | Disconnecting and removing the un-serviceable TCPM board of chiller unit of 100 TO 150 TR Air cooled/ Water cooled AC plant, from the existing position, supply and fixing in repairs new TCPM Board all as specified and directed by Engr-in-Charge. | 1 | Each Job | 1,00,000 ₹1 L | 36,000 ₹36,000 | 55,000 ₹55,000 | 89,000 ₹89,000 | 1,17,000 ₹1.2 L |
| 3.00 | Disconnecting and removing the un-serviceable RTAA compressor module/main mother board of chiller unit of 50 to 95 TR capacity, from the existing position, supply and fixing in repairs new RTAA Compressor Module/main mother board in chiller unit of same capacity AC plant all as specified and directed by Engr-in-Charge. | 2 | Each Job | 1,40,000 ₹2.8 L | 99,999 ₹2.0 L | 1,20,000 ₹2.4 L | 99,000 ₹2.0 L | 1,35,000 ₹2.7 L |
| 4.00 | Disconnecting and removing the un-serviceable RTAA compressor module/main mother board of chiller unit of 100 to 150 TR capacity, from the existing position, supply and fixing in repairs new RTAA Compressor Module/main mother board in chiller unit of same capacity AC plant all as specified and directed by Engr-in-Charge. | 1 | Each Job | 1,75,000 ₹1.8 L | 1,26,000 ₹1.3 L | 1,50,000 ₹1.5 L | 1,05,000 ₹1.1 L | 1,53,000 ₹1.5 L |
| 5.00 | Disconnecting and removing the un-serviceable TCPM board of chiller unit of 50 TO 95 TR Air cooled/ Water cooled AC plant, from the existing position,after fixing repairs replace at same position all as specified and directed by Engr-in-Charge. | 4 | Each Job | 30,000 ₹1.2 L | 45,000 ₹1.8 L | 40,000 ₹1.6 L | 27,000 ₹1.1 L | 36,000 ₹1.4 L |
| 6.00 | Disconnecting and removing the un-serviceable TCPM board of chiller unit of 100 TO 150 TR Air cooled/ Water cooled AC plant, from the existing position, after fixing repairs replace at same position all as specified and directed by Engr-in-Charge. | 3 | Each Job | 35,000 ₹1.1 L | 54,000 ₹1.6 L | 50,000 ₹1.5 L | 31,000 ₹93,000 | 45,000 ₹1.4 L |
| 7.00 | Disconnecting and removing the un-serviceable RTAA compressor module/main mother board of chiller unit of 50 to 95 TR capacity, from the existing position, after fixing repairs replace at same position all as specified and directed by Engr-in-Charge. | 3 | Each Job | 40,000 ₹1.2 L | 72,000 ₹2.2 L | 67,500 ₹2.0 L | 30,000 ₹90,000 | 45,000 ₹1.4 L |
| 8.00 | Disconnecting and removing the un-serviceable RTAA compressor module/main mother board of chiller unit of 100 to 150 TR capacity, from the existing position, after fixing repairs replace at same position all as specified and directed by Engr-in-Charge. | 2 | Each Job | 45,000 ₹90,000 | 99,999 ₹2.0 L | 1,00,000 ₹2 L | 40,000 ₹80,000 | 50,400 ₹1.0 L |
| 9.00 | Disconnecting and removing the un-serviceable Compressor oil filter of chiller unit of 50 TO 95 TR AC plant of any capacity and type, from the existing position, supply and fixing in repairs new Oil Filter all as specified and directed by Engr-in-Charge. | 3 | Each Job | 25,000 ₹75,000 | 6,300 ₹18,900 | 7,500 ₹22,500 | 25,000 ₹75,000 | 27,000 ₹81,000 |
| 10.00 | Disconnecting and removing the un-serviceable Compressor oil filter of chiller unit of 100 TO 150 TR Air cooled/ Water cooled AC plant, from the existing position, supply and fixing in repairs new Oil Filter all as specified and directed by Engr-in-Charge. | 3 | Each Job | 30,000 ₹90,000 | 9,000 ₹27,000 | 8,000 ₹24,000 | 29,000 ₹87,000 | 36,000 ₹1.1 L |
Updated dates
Tender Value
₹40.0 L
EMD Value
₹80,000
Closing Date
10 Mar 2026, 6:00 pmClosed
GE(I) R AND D RCI, HYDERABAD
GE(I) RND RCI, MILITARY ENGINEER SERVICES, VIGNYANAKANCHA, RCI, HYDERABAD
REPAIR AND MAINTENANCE OF EXV BOARD, DISPLAY BOARD VARIOUS SENSORS FOR PUMPS OIL FILTERS LEAK TESTING DESCALING OF CONDENSERS AT SINT CHECK OUT AIT RADOME DEVELOPMENT CENTER BONDED STORES MRSAM ARMY MRSAM FIRING UNIT ADVANCE HILLS, LASER PROPAGATION
2026_MES_752115_1
8376
Open Tender
Electrical and Maintenance Works
180 days
GE(I) R AND D RCI, HYDERABAD
MES enlisted Class D category c i enlisted Meeting enlistment criteria of D class in MES and having no recovery pending. For further details ref NIT
8 documents required · 8 mandatory
₹500
Yes
GE(I) R AND D RCI, HYDERABAD
₹80,000
Yes
8 Apr 2026
10 Feb 2026
12 Mar 2026
10 Feb 2026
10 Mar 2026
24 Feb 2026
stage.html
html • 0.03 MB
technical_842396.pdf
techsummary_842396.pdf
finance_842396.pdf
BOQ Comparative Chart
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_842396.xls
BOQ • 0.29 MB
8376PS.pdf
Tender Documents • 0.35 MB
Download all tender documents and submit your bid