Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 LAdmitted-Finance | ₹31.9 L | L1 | Admitted-Finance |
| 2 | L2₹36.2 LAdmitted-Finance AWADHI ROAD ADAJAN 1ST 102 DABKA NO 1 1 6 4 C 4TH FLOOR | GANDHINAGAR | ₹36.2 L | L2 | Admitted-Finance |
| 3 | L3₹36.2 LAdmitted-Finance 0000 UNNAMED ROAD GAJIYA KANTIT VINDHYACHAL MIRZAPUR UTTAR PRADESH 231307 UDYAM UP 57 0013322 | MIRZAPUR | UTTAR PRADESH | 231307 | ₹36.2 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R K ENTERPRISES L1 | siddharthenterprises L2 | J.K & Company L3 |
|---|---|---|---|---|---|---|
| 1.00Disconnecting the three phase power supply system from the starter of panel board and taking out defective submersible pump motor set 3 phase along with taking out / removing of column pipes and cable carefully and carryout with transporting to work shop for repairing purposed, after repairing/ rewinding of the submersible pump motor set, jointing of cableing work and re-assembling the pump motor sytem complete and relowering in the same position of well with the help of jointing / fixing of column pipe, cable and including providing of suitable size / type of rubber joint gasket along with replacement of defected nut & bolt etc after making submersible cabling joint connection and connected with three phase power supply starter system including checking and testing of fault and rectification of fault from existing starter system complete and testing the pump motor set on load complete all as specified & directed for the following capacity/rating :- | ||||||
| 1.01 | 7.5hp/10 hp | 2 | Each Job | 6,000 ₹12,000 | 7,500 ₹15,000 | 9,900 ₹19,800 |
| 1.02 | 15 hp | 2 | Each Job | 6,000 ₹12,000 | 9,500 ₹19,000 | 10,000 ₹20,000 |
| 1.03 | 20 hp - 22 hp | 3 | Each Job | 7,000 ₹21,000 | 11,800 ₹35,400 | 10,500 ₹31,500 |
| 1.04 | 25 hp - 30 hp | 4 | Each Job | 8,000 ₹32,000 | 14,500 ₹58,000 | 11,500 ₹46,000 |
| 1.05 | 41 hp | 2 | Each Job | 9,500 ₹19,000 | 19,000 ₹38,000 | 13,500 ₹27,000 |
| 1.06NOTE:- Replacement of unserviceable items/parts shall be measured & Paid for separately under respective items of BOQ. | ||||||
| 2.00Opening/ dismantling and taking out old unserviceable burnt out winding matrerial/ defected parts from the existing submersible electric motor system of suitable capacity including providing re-winding materials with water proof copper insulated wire all as existing gauge / size / type including it connecting winding jointing material and including repair / replacement of other connected minor defected burnt out parts of motor and after reassembling it testing of system and carryout with transporting from work shop to site complete all as specified & directed for the following capacity/rating :- | ||||||
| 2.01 | 7.5 hp/10 hp 3 phase 415 Volt | 1 | Each Job | 15,000 ₹15,000 | 7,500 ₹7,500 | 16,500 ₹16,500 |
| 2.02 | 15 hp, 3 phase,415 Volt | 1 | Each Job | 18,000 ₹18,000 | 8,500 ₹8,500 | 18,900 ₹18,900 |
Updated dates
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
16 May 2026, 6:00 pmClosed
GE (AF) Adampur
GE (AF) Adampur
REPAIR/ MAINTENANCE AND REPLACEMENT OF SUBMERSIBLE PUMPS/ SEWAGE PUMPS AND OTHER CONNECTED WORKS AT AF STN ADAMPUR
2026_MES_760771_1
GE(AF)/ADM/T-11 OF 2026-27
Open Tender
Pumps/Motors
180 days
Under GE (AF) Adampur
As per tender
8 documents required · 8 mandatory
₹500
GE (AF) Adampur
₹70,000
Yes
25 May 2026
17 Apr 2026
18 May 2026
17 Apr 2026
16 May 2026
2 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Disconnecting the three phase power supply system from the starter of panel board and taking out defective submersible pump motor set 3 phase along with taking out / removing of column pipes and cable carefully and carryout with transporting to work shop for repairing purposed, after repairing/ rewinding of the submersible pump motor set, jointing of cableing work and re-assembling the pump motor sytem complete and relowering in the same position of well with the help of jointing / fixing of column pipe, cable and including providing of suitable size / type of rubber joint gasket along with replacement of defected nut & bolt etc after making submersible cabling joint connection and connected with three phase power supply starter system including checking and testing of fault and rectification of fault from existing starter system complete and testing the pump motor set on load complete all as specified & directed for the following capacity/rating :- | |||||
| 1.01 | 7.5hp/10 hp | - | Each Job | - | - |
| 1.02 | 15 hp | - | Each Job | - | - |
| 1.03 | 20 hp - 22 hp | - | Each Job | - | - |
| 1.04 | 25 hp - 30 hp | - | Each Job | - | - |
| 1.05 | 41 hp | - | Each Job | - | - |
| 2Opening/ dismantling and taking out old unserviceable burnt out winding matrerial/ defected parts from the existing submersible electric motor system of suitable capacity including providing re-winding materials with water proof copper insulated wire all as existing gauge / size / type including it connecting winding jointing material and including repair / replacement of other connected minor defected burnt out parts of motor and after reassembling it testing of system and carryout with transporting from work shop to site complete all as specified & directed for the following capacity/rating :- | |||||
| 2.01 | 7.5 hp/10 hp 3 phase 415 Volt | - | Each Job | - | - |
| 2.02 | 15 hp, 3 phase,415 Volt | - | Each Job | - | - |
| 2.03 | 20 hp - 22 hp, 3 phase, 415 Volt | - | Each Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_852167.xls
BOQ • 0.30 MB
tender.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid