Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.8 LAccepted-AOC | L-1 | Accepted-AOC Work Awarded | |
| 2 | L-2₹11.8 L+₹96,000 (8.89%)Rejected-Finance | L-2 | Rejected-Finance L2 rejected | |
| 3 | L-3₹12.8 L+₹2.0 L (18.3%)Rejected-Finance | L-3 | Rejected-Finance L3 rejected | |
| 4 | L-4₹12.9 L+₹2.1 L (19.3%)Rejected-Finance 206 SHIVKRIPA ENCLAVE PLOT NO 1 27 SECTOR 3 AWAS VIKAS NO 3 KALYANPUR KANPUR NAGAR UTTAR PRADESH 208017 | KANPUR NAGAR | UTTAR PRADESH | 208017 | L-4 | Rejected-Finance L4 rejected |
| Sl No | Description | Qty | Unit | chemeco Engineers L4 | M/s Shree Krishna Electrics L2 | ECON L1 | WELLCURE ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Operation & Routine Maintenance of 550 KLD capacity sewage water treatment plant as following. Round the Clock Operation of plant by deputing following staff for One month. (a) Operator 1 No. for 3 Shifts (b ) Superwiser 1 No. for 1 Shift. | 12 | Month | 89,340 ₹10,72,080 | 80,000 ₹9,60,000 Lowest | 85,000 ₹10,20,000 | 88,000 ₹10,56,000 |
| 2.00 | Repair & maintenance : (a) Routine maintenance & minor repair of system including repair of motors & pumps (rewinding, oiling, greasing, ball bearing, coupling etc) and cleaning of UG/OH Tanks for One month (b) Analysis report of treated water quaterly (to be done by any approved/specilaised agency) (c ) Consumables required on day to day basis (to be added during water treatment) such as Poly Dosing and Bleaching powder etc of as required for One month | 12 | Month | 18,000 ₹2,16,000 | 18,000 ₹2,16,000 | 5,000 ₹60,000 Lowest | 18,500 ₹2,22,000 |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
16 Jun 2022, 12:00 pmClosed
Ex. Engineer (Elect)-I
OFFICE OF THE Ex. ENGINEER (ELECT)-I, SHAHDARA (N) ZONE, Keshav Chowk, Delhi-110053
Operation and Maintenance of STP-550 KLD Installed at SDN Hospital Under Shahdara (North) Zone
2022_EDMC_118577_1
EE(E)-I/SHN/EDMC/22-23/TC-10/1
Open Tender
Electrical Works
Item Rate
365 days
As per NIT
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
₹33,000
15 Jan 2026
9 Jun 2022
17 Jun 2022
9 Jun 2022
16 Jun 2022
9 Jun 2022
Amount
Operation & Routine Maintenance of 550 KLD capacity sewage water treatment plant as following. Round the Clock Operation of plant by deputing following staff for One month. (a) Operator 1 No. for 3 Shifts (b ) Superwiser 1 No. for 1 Shift.
Repair & maintenance : (a) Routine maintenance & minor repair of system including repair of motors & pumps (rewinding, oiling, greasing, ball bearing, coupling etc) and cleaning of UG/OH Tanks for One month (b) Analysis report of treated water quaterly (to be done by any approved/specilaised agency) (c ) Consumables required on day to day basis (to be added during water treatment) such as Poly Dosing and Bleaching powder etc of as required for One month
M/s Shree Krishna Electrics
WELLCURE ENTERPRISES
chemeco Engineers
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .