| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹38.5 LAccepted-AOC GOVT CONT VILLAGE AND P O NANIKHAD TEHSIL BHATTIYAT AND DISTT CHAMBA H P | ₹38.5 L Quoted ₹60.7 L | 1 | Accepted-AOC L1 |
| 2 | 2₹63.0 LRejected-Finance HIMACHAL PRADESH HP | ₹63.0 L | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | A.R ENTERPRISES L1 | Ajay Kumar L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in earth work, in all kinds of soil such as pick work, jumper work, blasting work in hard / soft rocks, chiseling / wedging out of hard / soft rocks including dewatering in saturated soil up to all leads and lifts, staking the excavated soil / materials upto all leads and lifts clear from the edge of excavation and then returning the stacked excavated soil in all layers when required into plinths sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as per direction of Engineer-in-Charge. | 85.94 | Per cum. | 790 ₹67,892.60 | 750 ₹64,455 |
| 2.00 | Providing and laying cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 40mm nominal size) excluding cost of centring and shuttering in: Foundations and plinth | 9.8 | Per cum. | 8,760 ₹85,848 | 8,100 ₹79,380 |
| 3.00Providing and laying cement concrete 1:1 ½:3 (1cement 1 ½ sand :3 stone aggregate 20 mm nominal size) and curing complete but excluding the cost of form work and reinforcement for reinforced concrete work | |||||
| 3.01 | Foundation footings bases of columns and the like and mass concrete within all leads and lifts as per the direction of Engineer-in-charge. | 9.14 | Per cum. | 10,720 ₹97,980.80 | 9,400 ₹85,916 |
| 3.02 | Wall (any thickness but not less than 0.10 mts. thickness) attached pillasters, buttresses plinth, and string courses etc.from top of foundation level upto floor two level within all leads and lifts as per the direction of Engineer-in-charge. | 35.09 | Per cum. | 10,838 ₹3.8 L | 9,900 ₹3.5 L |
| 4.00 | Providing and laying cement concrete using M-25 (Design Mix) but not less than 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in :- Suspended floor, roofs, landing and shelves and their supports balconies, beams, girders, bressumers and cantilevers upto floor level within all leads and lifts as per the direction of Engineer-in-charge. | 8.47 | Per cum. | 10,100 ₹85,547 | 9,200 ₹77,924 |
| 5.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4meters and removal of the same for in-situ reinforced concrete and plain. | |||||
| 5.01 | Flat surface such as soffits of suspended floors, roofs, landing and the like floors etc. upto floor to 200mm in thickness within all leads and lifts as per the direction of Engineer-in-charge. | 37.22 | Per Sqm. | 710 ₹26,426.20 | 630 ₹23,448.60 |
| 5.02 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasres buttresses, plinth and string courses and the like ith in all leads and lifts as per the direction of Engineer-in-charge. | 349.08 | Per Sqm. | 467 ₹1.6 L | 460 ₹1.6 L |
| 5.03 | Edge of slabs and breaks in floor and walls.(under 20.00cm. wide) within all leads and lifts as per the direction of Engineer- in -Charge. | 8.31 | Per Rmt.. | 165 ₹1,371.15 | 170 ₹1,412.70 |
Tender Value
Refer Docs
EMD Value
₹78,622
Closing Date
26 Dec 2025, 5:00 pmClosed
Executive Engineer Jal Shakti Division Chamba
Executive Engineer Jal Shakti Division Chamba
Establishment of FSSM Co-Treatment system capacity 12.95 KLD along with existing sewage treatment plant
2025_HPIPH_123732_1
JSV-CBA-GA-2025-8301-8353 dated 17.12.2025
Open Tender
Civil Works - Water Works
180 days
Chamba
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,500
Executive Engineer Jal Shakti Division Chamba
₹78,622
2 Apr 2026
17 Dec 2025
27 Dec 2025
17 Dec 2025
26 Dec 2025
17 Dec 2025
Excavation in foundation, trenches etc. in earth work, in all kinds of soil such as pick work, jumper work, blasting work in hard / soft rocks, chiseling / wedging out of hard / soft rocks including dewatering in saturated soil up to all leads and lifts, staking the excavated soil / materials upto all leads and lifts clear from the edge of excavation and then returning the stacked excavated soil in all layers when required into plinths sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as per direction of Engineer-in-Charge.
Providing and laying cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 40mm nominal size) excluding cost of centring and shuttering in: Foundations and plinth
Providing and laying cement concrete 1:1 ½:3 (1cement 1 ½ sand :3 stone aggregate 20 mm nominal size) and curing complete but excluding the cost of form work and reinforcement for reinforced concrete work
Foundation footings bases of columns and the like and mass concrete within all leads and lifts as per the direction of Engineer-in-charge.
Wall (any thickness but not less than 0.10 mts. thickness) attached pillasters, buttresses plinth, and string courses etc.from top of foundation level upto floor two level within all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying cement concrete using M-25 (Design Mix) but not less than 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in :- Suspended floor, roofs, landing and shelves and their supports balconies, beams, girders, bressumers and cantilevers upto floor level within all leads and lifts as per the direction of Engineer-in-charge.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4meters and removal of the same for in-situ reinforced concrete and plain.
Flat surface such as soffits of suspended floors, roofs, landing and the like floors etc. upto floor to 200mm in thickness within all leads and lifts as per the direction of Engineer-in-charge.
Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasres buttresses, plinth and string courses and the like ith in all leads and lifts as per the direction of Engineer-in-charge.
Edge of slabs and breaks in floor and walls.(under 20.00cm. wide) within all leads and lifts as per the direction of Engineer- in -Charge.
White washing with lime on undecorated wall surfaces two coats to give an even shade including thoroughly brooming the surface to remove all dirt, dust, mortar dirt and other foreign matter.
Providing Tor steel reinforcement for RCC work including bending,binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge.
Boulder filling dry hand packed tightly under floor. within all leads and lifts as per the direction of Engineer-in-charge.
Second Class Bricks: Brick work using common burnt clay building bricks in foundation and plinth in Cement Mortar 1:4 (1 cement : 4 sand) within all leads and lifts as per the direction of Engineer-in-charge.
20mm cement plaster in single coat on rough side of brick/stone masonry for interior plastering upto floor two level including arrises, internal rounded angles, chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth. Cement Mortar 1:4 (1 cement : 4 sand)
Area for covering Passive Solid Liquid Separation Units up to Drying Extent along with Moisture Dispersion Arrangements within all leads and lifts as per the direction of Engineer-in-charge.
Providing Laying jointing and testing of DI pipe spigot and socketed pipe with CML (SBR tyton push on joint) complete in all respects as per IS 8329-2900 class K7 diamensions weight and test pressuers in all respect and as per patest ammendments or adition.
150MM dia nominal bore
Providing and jointing tyton (Push on joints) to Ductile iron pipe and fitting including testing of the joints, cost of rubber gasket (EDPM quality)conforming to IS 3382 latest edition/ ammendments complete in all respect within all leads and lifts and as per latest ammendments or edition.
Providing and jointing tyton (Push on joints) to Ductile iron pipe and fitting including testing of the joints, cost of rubber gasket (EDPM quality)conforming to IS 3382 latest edition/ ammendments complete in all respect within all leads and lifts and as per latest ammendments or edition.
150mm nominal bore
Providing and fixing Cast Iron Sluice valve (IS 148846:2000) .within all leads and lifts and as per latest ammendments or edition.
150mm nominal bore
Water Recycle Pumps (Centrifugal) non clog centrifugal pumps of 10-15 m3/hr capacity for 12-20 m dynamic head. However actual pump combinations will be decided by characteristic curve supplied by the manufacturer which also ensures tripping period of each pump is not less than 5 minutes, KSB, Kirloskar, Mather and Platt, Jyoti.
Providing and Installation Sludge dewatering system (screw press) with all necessary arrangements with 3 m3/hr capacity within all leads and lifts and as per latest ammendments or edition.
Providing and Installation Control panel, LandT Components within all leads and lifts and as per latest ammendments or edition.
Providing and InstallationCable necessary capicity, RR/Havells within all leads and lifts and as per latest ammendments or edition.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.33 MB
6form.pdf
Tender Documents • 0.36 MB
form8.pdf
Tender Documents • 1.44 MB
conditions.pdf
Additional Documents • 0.19 MB
BOQ_181781.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid