| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.2 LAccepted-AOC WARD NO 14 RAMNAGAR DISTT ANUPPUR MADHYA PRADESH 484 440 | ANUPPUR | ANUPPUR | MADHYA PRADESH | 484440 | ₹2.2 L Quoted ₹1.9 L | L-1 | Accepted-AOC ACCEPTED BEING ELIGIBLE L1 BIDDER AND ACCEPTABLE RATE. |
| 2 | Rejected-Technical D 28 B S L COLONY DUGDHA COAL WASHERY BOKARO JHARKHAND | BOKARO | BOKARO | JHARKHAND | 828404 | - | - | Rejected-Technical NOT OPENED FOR TECHNICAL EVALUATION SINCE NOT BEING L1 BIDDER. HENCE REJECTED. |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT OPENED FOR TECHNICAL EVALUATION SINCE NOT BEING L1 BIDDER. HENCE REJECTED. |
Tender Value
₹6.2 L
EMD Value
₹7,800
Closing Date
25 Apr 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), HASDEO AREA, SECL
OFFICE OF THE STAFF OFFICER (CIVIL), HASDEO AREA, GM OFFICE, SOUTH JHAGRAKHAND COLLIERY, DISTT.- MANENDRAGARH-CHIRMIRI-BHARATPUR (C.G.)-497 448. NAME AND MOBILE NUMBER OF CONTACT PERSON SHRI D.K. VISHWAKARMA, 94255 33508 (Phone)
Providing and Cleaning of Garland drain around Rajnagar OC Mine working edge of east side to low level Area under Rajnagar OC of Hasdeo Area.
2026_SECL_358342_1
GM/HSD/C/e-Tender/26-27/04 Date 13.04.2026
Open Tender
Civil Works - Others
30 days
Rajnagar OCP of Hasdeo Area Distt.- Anuppur (M.P.)
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,800
4 May 2026
14 Apr 2026
27 Apr 2026
14 Apr 2026
25 Apr 2026
15 Apr 2026
14 Apr 2026 - 18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil | - | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1: 3: 6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1: 1.5: 3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1: 1.5: 3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | sqm | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | - | kg | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Laying Reinforced Cement Concrete Pipe NP3/ prestrssed concrete pipe on first class bedding in single row. Providing and Laying Reinforced cement concrete pipe NP3/prestrssed concrete pipe for culverts on first class bedding of granular material (cost of bedding included) (Length 2.50mtr.) 900 mm dia. R.C.C. pipe | - | metre | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Total impact of GST for the purpose of CTC | - | Nos | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_371218.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Tendernotice_2.pdf
PDF • 2.06 MB
Tendernotice_3.pdf
PDF • 1.24 MB
BOQ_371218.xls
BOQ • 0.33 MB