Loading…
Loading…
Tender Value
₹65 L
EMD Value
₹1.3 L
Closing Date
29 Aug 2026, 6:00 pm5d left
DFO POONCH
Near sports stadim poonch
As per Nit and BoQ
2026_FD_321783_2
e-NIT No. 12 of 2026-27
Open Tender
Civil Works
Percentage
90 days
POONCH
KINDLY REFER ATTACHMENT
2 documents required · 2 mandatory
₹500
DFO POONCH
₹1.3 L
22 Aug 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
29 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | 0.8 | Cum | - | - |
| 2 | Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil | 0.6 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) | 1 | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 0.4 | Cum | - | - |
| 5 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 sand 4 graded stone aggregate 20mm nominal size | 0.8 | Sqm | - | - |
| 6 | Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in super structure Cement mortar 1:6 ( 1 cement : 6 fine sand) | 0.6 | Cum | - | - |
| 7 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level Qty vide item no:-6 | 0.6 | Cum | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 1 | - |
| 9 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. | 1 | Cum | - | - |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_1076171.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].