Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 2 | Accepted-Technical FLAT NO 709 KSS GROUP SOCIETY GH 12 LALLESHWARI VATIKA SECTOR 21D FARIDABAD FARIDABA FARIDABAD HARYANA 121012 | FARIDABAD | HARYANA | 121012 | Accepted-Technical Technically Qualified |
| 3 | Rejected-Technical | Rejected-Technical Technically disqualified |
| 4 | Rejected-Technical | Rejected-Technical Technically disqualified |
| 5 | Rejected-Technical | Rejected-Technical Technically disqualified |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
7 Sept 2026, 2:00 pmClosed
GM
TCIL Bhawan,G K 1, NewDelhi -110048
Establishment of Advanced Immersive Learning Infrastructure (AR/VR/MR Lab)
2026_TCIL_289201_1
TCIL/ITCS/ARVR/0817
Open Tender
Computer- Data Processing
EOI
New Delhi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5 L
Yes
22 Sept 2026
28 Aug 2026
8 Sept 2026
28 Aug 2026
7 Sept 2026
29 Aug 2026
AR/VR/MR Immersive Lab – Software & Content Development Scope
# Parameter Details Notes / Remarks
1 Domain / Use Case 1 – Tactical Law enforcement simulations, security operations, situational response
2 Domain / Use Case 2 – Forensic Crime scene walkthroughs, evidence analysis Supports policing and investigative training
3 Domain / Use Case 3 – Classroom / Academic Concept visualization, interactive immersive learning modules General academic delivery across departments
4 Total No. of Modules (Initial Deployment) 8–12 modules Scalable in future phases based on academic and training requirements
5 Module Duration (per module) Typically 10–25 minutes Duration varies with complexity and learning objectives
6 Development Approach Combination of: (a) Pre-built industry-standard modules, and (b) Custom-developed content aligned with client's domain-specific requirements Custom content to be developed in consultation with client domain experts
7 Milestone – Month 3–4 Identification, customization, and initial deployment of modules First deliverable milestone
8 Milestone – Month 4–5 Testing, validation, and refinement of deployed modules QA and iteration phase
9 Milestone – Month 5–6 Integration with training workflows and academic delivery systems Final integration and go-live for Phase 1 content
10 Content Planning Approach Joint detailing and prioritization of modules with client domain experts during content planning phase TCIL + Client collaborative planning session required before Month 3
AR/VR/MR Immersive Lab – Software & Content Development Scope
# Parameter Cost of Development /5 Mins Total Duration (In Mins) Total Amount / Module
1 VR Ready Modules 0 3
Total Number of Modules 15
Duration of each module(In Mins) 15
Cost/Per Module (Excluding GST)
Total Cost for 15 Modules (Excluding GST)
Training /Implementation (7 days) + Logistic and Support + Web Based Platform 0
AR/VR/MR Immersive Lab – Hardware Scope with Indicative Quantities (Batch Size: ~30 Users)
# Category Equipment / Device Make / Model (Indicative) Qty (Indicative) Purpose / Use Notes / Remarks Price Per Unit Qty Total Price without Tax Comment
1 XR Devices VR Headsets (Standalone / All-in-One) Meta Quest 3 / VR AiO * 12–15 units Primary VR device for training sessions; supports standalone operation Most units in the lab; workhorse for tactical and classroom modules 0 15
2 XR Devices High-End PC-Based VR Systems HTC Vive Pro 2 * 3–5 units High-fidelity, tethered VR for complex, graphics-intensive simulations Requires VR-ready workstation/laptop; ideal for forensic simulations 0 5
3 XR Devices Mixed Reality (MR) Devices Magic Leap 2 Developer Pro ** 2–3 units MR overlays for real-world + virtual blended training scenarios Replaces discontinued Microsoft HoloLens 2 (OEM procurement no longer available) 0 3
4 XR Devices Advanced Visualization Headset Apple Vision Pro * 1–2 units Advanced spatial computing for high-end demos and visualization Premium device for leadership demos and showcases 0 2
COMPUTING & DISPLAY
5 Computing & Display High-End Workstations — 2–3 units VR content rendering, lab management, SCADA/backend systems Must meet VR-ready specs (RTX-class GPU, 32GB+ RAM) 0 3
6 Computing & Display VR-Ready Laptops — 2–3 units Mobile deployment of VR content, instructor use, remote support Portable alternative to workstations for field or classroom use 0 3
7 Computing & Display Tablets Samsung Galaxy Tab * 8–10 units AR-based interaction, student coordination, AR module delivery Supports AR content; doubles as instructor management console 0 10
8 Computing & Display Interactive Flat Panel (IFP) 75" Interactive Display 1 unit Group viewing, instructor-led demonstrations, debrief sessions Central display for shared screen sessions and assessments 0 1
9 Computing & Display Wall-Top Projection System Roombr 1 unit Large-format immersive spatial projection for group scenarios Enhances room-scale immersive experiences 0 1
AUDIO & NETWORKING INFRASTRUCTURE
10 Infrastructure Sound System — 1 complete setup Immersive spatial audio for VR environments and simulations Must be compatible with multi-channel output 0 1
11 Infrastructure Wi-Fi 7 Router (Mesh-capable) — 1–2 units High-bandwidth wireless connectivity for all XR devices simultaneously Wi-Fi 7 (802.11be) required to support 12–15 concurrent VR headsets 0 2
DEVICE MANAGEMENT ACCESSORIES 0
12 Accessories XR Device Charging Station (Calibrated) Precision Charging + Integrated Storage Unit (10-device) 2 units ESD-protected storage + simultaneous calibrated charging with surge protection Replaces HoloLens 2 line item; improves device lifecycle management and lab discipline 0 2 Simultaneous charging with surge protection
POWER & GROUNDING (TCIL RECOMMENDED ADD-ONS)
13 Power & Grounding Online UPS (Pure Sine Wave, Isolation-Supported) 8 KVA UPS 1 unit Uninterrupted and clean power supply for all critical XR, projection, and networking systems Covers current load with headroom for future expansion; recommended by TCIL for equipment protection 0 1 UPS with batteries set
14 Power & Grounding Digital Grounding Device — 1 unit Mitigates voltage fluctuation risks and static discharge issues Protects XR tracking accuracy, projection systems, and network infrastructure 0 1
TOTAL HARDWARE LINE ITEMS 14 items Total
Item Number Item Title Item Quantity Commercials (Excluding GST) Commercials (Including GST)
1 Hardware Devices with 3 year warranty 1
2 Virtual Reality Module Development 15
3 Training /Implementation (7 days) + Logistic and Support + Web Based Platform 1
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
EOIARVRMR.pdf
Tender Documents • 0.89 MB
PriceBidARVR.xls
Other Document • 0.06 MB
Checklist.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .