| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹83.2 LAdmitted-Finance | +4.20% | ₹83.2 L | L1 | Admitted-Finance |
| 2 | L2₹83.8 L+₹63,082.51 (0.76%)Admitted-Finance GOA | +4.99% | ₹83.8 L+₹63,082.51 (0.76%) | L2 | Admitted-Finance |
Tender Value
₹79.9 L
EMD Value
₹1.6 L
Closing Date
7 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
DIVISION XVI (BLDGS), P.W.D. PONDA GOA
Reconstruction of Government Primary School at Tariwada Shiroda.
2026_PWD_31459_1
PWD/DIVISION XVI (BC)/TS/12/2026-2027 Line 01
Open Tender
Civil Works - Buildings
Percentage
150 days
Government Primary School at Tariwada Shiroda.
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.6 L
8 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
7 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tiled roofing (mangalore or pot or country tiles) with battens etc. complete including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. | 241.92 | sq.m | 79 | ₹19,111.68 |
| 2 | Dismantling wood work of sectional area 40 sq.cm. and above wrought framed and fixed in frames, other frames and trusses including stacking of material within 50 mts. lead (span upto 10 mtrs.) | 9.57 | cu.m | 2,056 | ₹19,675.92 |
| 3 | Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. | 149.51 | cu.m | 1,136 | ₹1,69,843.36 |
| 4 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in :a) All kinds of soil | 371.11 | cu.m | 286 | ₹1,06,137.46 |
| 5 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 125.67 | cu.m | 2,211 | ₹2,77,856.37 |
| 6 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :a)All works upto plinth level | 62.85 | cu.m | 6,635 | ₹4,17,009.75 |
| 7 | Providing anti – termite treatment to buildings conforming to I.S.S. 6113 part II 1971 (revised) including adopting precautions for health hazards and safety measures as required therein with the cost of all materials, chemicals, plants, equipments required for the treatment and furnishing a guarantee for a minimum period of 10 years from the date of completion including eradicating any infestation of termite free of cost during the guaranty period complete. (The payment will be made on plinth of the building. b) Post construction | 202.62 | sq.m | 88 | ₹17,830.56 |
| 8 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 173 | cu.m | 245 | ₹42,385 |
| 9 | Providing and laying in position machine batched concrete (BMC), machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete work including pumping of concrete to the site of laying but excluding the cost of centering , shuttering, finishing and reinforcement including admixtures in recommended proportions as per IS 9103 to accelerate, retard setting of concrete, improve workability without impairing the strength and durability as per the direction of the Engineer-in-charge. M25 grade of reinforced cement conrete by using 410kg of cement per cu.m. of concrete. All works upto floor V level. | 139.89 | cu.m | 8,058 | ₹11,27,233.62 |
| 10 | Add for providing richer or leaner mixes respectively at all floor levels i)Providing M-30 grade concrete by using 420kgs of cement per cu.m. of concrete instead of M-25 grade of B.M.C. | 139.89 | cu.m | 82 | ₹11,470.98 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_31843.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .