Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹81.7 LAdmitted-Finance | -25.32% | ₹81.7 L | L1 | Admitted-Finance |
| 2 | L2₹86.5 LAdmitted-Finance HIMANSU SHEKHAR SWAIN ODISHA | -20.97% | ₹86.5 L | L2 | Admitted-Finance |
| 3 | L3₹86.9 LAdmitted-Finance | -20.55% | ₹86.9 L | L3 | Admitted-Finance |
| 4 | L4₹88.0 LAdmitted-Finance | -19.55% | ₹88.0 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical As per the decision of Tender Evaluation Committee |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
8 Apr 2026, 5:00 pmClosed
C.C.E, Northern R AND B Circle, SAMBALPUR
O/O THE C.C.E, Northern R AND B Circle, SAMBALPUR
BUILDING WORK
2026_EICCL_127541_5
CCENC (R AND B) /23/ 2025-26
National Competitive Bid
Civil Works - Buildings
180 days
DEOGARH
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹1.1 L
Yes
4 Jun 2026
24 Mar 2026
9 Apr 2026
24 Mar 2026
8 Apr 2026
24 Mar 2026
24 Mar 2026 - 31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing jungle cutting uprooting buses below 1.00m girth with cost of all labour and T&P required for the work etc. complete. | |||||
| 2Earthwork in excavation of foundation trenches in All kinds of soil including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site with all leads and lifts, including shoring, shuttering and dewatering (if required) with cost of labour, hire & running charges of water pumps sundries & T&P required for the work complete as directed by the Engineer-in-charge. | |||||
| 3Ground Floor | |||||
| 4Servant Quarter | |||||
| 5Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. | |||||
| 6Ground Floor | |||||
| 7Servant Quarter | |||||
| 8Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. In depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only). | |||||
| 9Ground Floor | |||||
| 10Servant Quarter | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
5CQRDGH.pdf
Tender Documents • 1.42 MB
BOQ_586040.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid