| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.3 LAccepted-AOC M6119 S 11 B BLOCK RACE VIEW APARTMENTS NO 12 VANDIKARAN STREET VELACHERY CHENNAI 600 042 | CHENNAI | CHENNAI | TAMIL NADU | 600042 | L1 | Accepted-AOC L1 Tenderer Lowest rate is accepted | |
| 2 | L2₹77.6 L+₹4.8 L (6.59%)Rejected-AOC | L2 | Rejected-AOC L2 Tenderer Highest rate |
Tender Value
₹68.3 L
EMD Value
₹44,165
Closing Date
27 Sept 2023, 1:00 pmClosed
Joint Commissioner/Executive officer
Arulmigu Subramaniya Swamy Temple Tiruchendur.
Renovation work to Arulmigu Ganapatheeswarar temple at Kayalpattinam town belongs to Arulmigu Subramaniya Swamy Temple Tiruchendur.
2023_HRCE_361472_2
2626/2022/A3
Open Tender
Civil Works - Others
Lump-sum
185 days
Kayalpattanam, Tiruchendur
Please refer Tender documents.
10 documents required · 10 mandatory
₹17,700
₹44,165
30 Jan 2024
13 Sept 2023
27 Sept 2023
13 Sept 2023
27 Sept 2023
13 Sept 2023
Amount
Centering for sides and soffits of Rcc slabs of plain surface like lintels, beams, etc., including strutting 3M hight using MS sheets of size 90cmx60cm and BG 10 stiffened with MS angles of size 25x25x3mm laid over silver oak (C.W) joists of size 10x6.5cm (spaced at about 90cm c/c) and supported by casurina prop. 10cm to 13cm dia ( spaced of 75cm c/c) complying with standard specification and directed by the Dept, Officers. 10sqm.
Brick / stone masonry in Cement mortar walls under 3m high
Dismantling the Weathering course and pressed tiles clearing away from the site etc.,complete.
Removing the old pauvkal from the 3.50m height using with palm tree and grane including labour charges for numbering the old stone without any damages etc complete.,complying with standard specification.
Removing the old Uthiravari from the 3.50m height using with palm tree and grane including labour charges for numbering the old stone without any damagesetc complete .,complying with standard specification.
Dismantling Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs
Dismantling, clearing away and carefully stacking materials useful for re-use for Doors & windows including removal of frames, hinges and fastenings
Supply of Cut stones suitable quality,varity and of required size for construction of Kalkaram , Varivargams Ornamental, Sculptural and Thirumathil works including cost and conveyance of stone, loading and unloading charges and all other incidential charges etc complete.
A) Cut stone for walls,
b) Cut stone for bothiyal ,pillar ,uthiram, pavukkal,Nilaikal
Labour charges for Dressing and fixing the cut stone in position with cement mortar 1:3, and neatly finishing the same including single line dressing wherever necessary, cost and conveyance of smithy materials and tools, charcoal, mending charges etc,. but excluding cost of Granite stone, cement sand etc., complete as directed by the Departmental officers. complete for Upadeedam, Adhistanam, Pathavargam and upto Prastaram etc
Inner Course
Uthiram
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Cement Mortar 1:5 & Combination Mortor1:1:5 etc complete.
Labour charges for Palamunai dressing of required faces of new Cut stones consisting of Upabeedam, Adhistanam, Pathavargam, Prastharam, etc., neatly finishing and fixing in position with Cement Mortar 1 : 3 , including cost and conveyance of smithy materials and tools, Charcoal, mending charges etc., but excluding cost of Granite stone, Cement, sand etc., complete as directed by the Departmental officers.
Random Rubble Masonry in CM 1:5 (one of cement and five of sand) using new rough stone for core wall filling including cost and conveyance of all materials and labour charges, with simultaneous flush pointing, curing etc complete as directed by the departmental officers.
Labour charges for Pointing the Cut stone masonary work with Cement Mortar 1:1:3 excluding cost and conveyance of cut stone but including all labour charges scaffolding etc complete with standard specifications.
Refixing the old Pavukal from ground level to 3.50m height using with palm tree and grane including labour charges for numbering the old stone without any damages etc complete
Weathering Course with broken 20mm brick jelly lime Concrete 1:2:5 The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works .
Finishing the Top of Roof with One course of machine Pressed Tiles 200 x 200 x 20mm The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works ..
Refixing the old Uthiravari from ground level to 3.50m height using with palm tree and grane including labour charges for numbering the old stone without any damages etc complete
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Size of door 3’ 6” x 6’ 0”
Size of door 4’ 0” x 7’ 0”
Size of door 7’ 0” x 11’ 0”
Painting New Wood work with Two coatsof Synthetic enamel paint over a priming coat
Supply and fixing of M.S.Grill works using M.S flats and angles including One Coat of primer etc., complete.
Painting New iron work with Two coats of Synthetic enamel paint over a priming coat
Centering for soffits of Rcc slabs of plain surface like lintels, beams, etc., including strutting 3M high using MS sheets of size 90cmx60cm and BG 10 stiffened with MS angles of size 25x25x3mm laid over silver oak (C.W) joists of size 10x6.5cm (spaced at about 90cm c/c) and supports 75cm c/c complying with standard specification and directed 10sqm.
Supply and Filling in foundation and basement with Gravel including all cost and materials and labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
C.V.T ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .