| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC GURSARAI JHANSI UTTAR PRADESH | JHANSI | UTTAR PRADESH | 284001 | ₹4.9 L | L1 | Accepted-AOC AOC |
| 2 | L2₹5.0 LRejected-Finance | ₹5.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹5.0 LRejected-Finance GURSARAI JHANSI UTTAR PRADESH | JHANSI | UTTAR PRADESH | 284001 | ₹5.0 L | L3 | Rejected-Finance L3 |
Tender Value
₹5.0 L
EMD Value
₹49,539
Closing Date
5 May 2026, 5:00 pmClosed
EO
NPP Gursarai
7-Npp Gursarai Ke Antargat Mohalla Matwana Ward No 01 Me Karas Dev Mandir Ke Pas Sarvjanik Dalan Ka Nirman Karya
2026_DOLBU_1138470_1
27/NPPG/15VA/2026-27/ DATE-15.04.2026
Open Tender
Civil Works - Others
45 days
npp gursarai
Please refer Tender documents.
2 documents required · 2 mandatory
₹840
Yes
EO
₹49,539
Yes
27 May 2026
20 Apr 2026
6 May 2026
20 Apr 2026
5 May 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetations grass, bush, wood trees and saplings of grith upto 30 cm. Measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 50 metres outside the periphery of area cleared. SI. No. 259 | - | Sqm | - | - | 1 |
| 2 | Excavation in foundation in ordinary soil(Loam clay or sand).including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches. S.I no - 251 | - | Cum | - | - | 2 |
| 3 | Cement concrete with 4cm gauge approved stone ballast, approved coarse sand, cement in the proportion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work.PCC SI No.281 | - | Cum | - | - | 3 |
| 4 | RCC work with cement approved coarse sand, and 2cm (3/4") gauge, approved stone ballast in the proportion 1:1.5:3 in Plinth Beam/Slab beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. s.i no- 286-1st | - | Cum | - | - | 4 |
| 5 | RCC work with cement approved coarse sand, and 2cm (3/4") gauge, approved stone ballast in the proportion 1:1.5:3 in lintels of doors and windows, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. SI. No. 283 (1) | - | Cum | - | - | 5 |
| 6 | RCC work with cement approved coarse sand, and 2cm (3/4") gauge, approved stone ballast in the proportion 1:1.5:3 in Slab and shelf, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. SI. No. 284 (I) | - | Cum | - | - | 6 |
| 7 | Mild steel or iron work in plain work such as reinforced concrete/brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks, and authorized over lapping shall be measured.SI. No. 504 | - | Qtl | - | - | 7 |
| 8 | Class-150 brick work in 1:6 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (Si. N0. 303) | - | Cum | - | - | 8 |
| 9 | Class-150 brick work in 1:6 cement and fine sand of 1.25 fineness modulus mortar in super structure including supply of all materials, labour and tools and plants etc. required for proper completion of the work.SI No. 303+309+310 | - | Cum | - | - | 9 |
| 10 | Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in super structure including supply of all materials, labour and tools and plants etc. required for proper completion of the work.SI No. 305+309+310A | - | Cum | - | - | 10 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.