Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.0 LAccepted-AOC | ₹87.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹87.2 L+₹21,091.78 (0.24%)Rejected-Finance | ₹87.2 L+₹21,091.78 (0.24%) | L2 | Rejected-Finance L2 |
| 3 | L3₹89.9 L+₹2.9 L (3.30%)Rejected-Finance | ₹89.9 L+₹2.9 L (3.30%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical E 315 1ST FLOOR SECTOR 27 NOIDA G B NAGAR 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | - | - | Rejected-Technical DIS-QUALIFIED |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
30 Jan 2026, 5:00 pmClosed
SM_TENDER CELL
GNIDA OFFICE
Maintenance work (Drain cleaning, Jungle cleaning, Road marking, Painting, White washing and other miscellaneous work) of 60 m wide road along Sector-Mu for three years, Greater Noida.
2026_GNIDA_1107496_30
SM/(TENDER CELL)/2026/703 DATED-17.01.2026
Open Tender
Civil Works
Fixed-rate
1095 days
GREATER NOIDA
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹2,590
₹2.8 L
12 Jun 2026
21 Jan 2026
2 Feb 2026
21 Jan 2026
30 Jan 2026
21 Jan 2026
Cleaning jungle including up rooting of rank, vegitations grass, push, wood trees and samplings of grith upto 30 cms. Measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50 M. out side the periphery of area cleared. (SOR-20/4.06/259(i)) Same as above 259(i) above but grass only. (SOR-20/4.06/259(a))
Tractor with trolley including POL and driver. (SOR-20/Ch-2/SI. No. 19)
Supply of labour. (SOR-20/Ch-2/SI. No. 12)
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m. All kinds of soil. (DSR-2018/2.28.1/AR)
Tractor with trolley including POL and driver. (SOR-20/Ch-2/SI. No. 19)
Supply of labour. (SOR-20/Ch-2/SI. No. 12)
Providing JCB with driver and including POL (SOR-20/Ch-2/SI. No. 31)
Excavation in foundation in ordinary soil (Lorm,Clay or sand ) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removel and disposal of surplus earth as directed by the engineer incharge upto distance of 30 M.from the foundation trenchess.( where machine con not reach / move ). (SOR-20/4.01/251(a))
Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required. (DSR-18/2.24.1/AR)
Cartage of earth or fly ash when added to schedule item no. 253 : 1st Km. (If lead is beyond 1/2 Km.). (SOR-20/4.08/261(b))
Excavation in foundation in ordinary soil (Lorm,Clay or sand ) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removel and disposal of surplus earth as directed by the engineer incharge upto distance of 30 M.from the foundation trenchess.( where machine con not reach / move ). (SOR-20/4.01/251(a))
Supply at Site: R.C.C standards post/ struts/rails/pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 12 mm nominal size) with wooden plugs of 6 mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth workes in excavation concrete works in foundation to be paid separately). DSR-2018/16.15.1/AR
Fencing with R.C.C post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire. DSR-18/16.17.1/AR
Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/5.08/281)
Painting with aluminium paint of approved brand and manufacture to give an even shade: One or more coats on old work. DSR-18/13.100.1/AR
Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost). (DSR-2018/16.85/AR)
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). (DSR-2018/16.69/AR)
White washing one coat including supply of all materials, labour, tool & Plants etc. required for proper completion of the work, (SOR-20/6.01/671)
Providing and fixing SFRC Cover over chamber. (without frame) 50mm thick. Size: 600x600mm (Medium duty)
Providing and fixing SFRC Cover over chamber. (with frame) 50mm thick. Size: 600x600mm (Medium duty)
M-150 Brick Work in 1:6 cement & fine sand 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work. Same as item no. 303 but in 1:4 one cement & 4 fine sand of 1.25 F.M. mortar. (SOR-20/6.05/305) Same as item no. 305 but in 1:4 one cement & four Coarse sand of 2.20 F.M. mortar. (SOR-20/6.05/305(a))
12mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand). (DSR-18/13.4.2/AR)
Plain/Reinforceed cement concrete in open foundation complete as per drawing and technical specifiations.RCC Grade M25 using batching plant transit mixture and manual placing. MoRTH-20/9.06/E/Case-II
Steel Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo mechanically treated barsof grade Fe-500D or more. (DSR-18/5.22.6/AR)
Tractor with water tanker with cost of water including P.O.L. (SOR-20/Ch-2/SI. No. 27)
Supply of labour. (SOR-20/Ch-2/SI. No. 12)
Painting or varnishing with valsper or other approved high grade enamel or super par synthetic clean varnish complete one coat over previously painted surface including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. paint to be used should confirm ISI no. 105/106/133-1950 (SOR-20/15.07/647)
Providing and applying of hot applied thermoplastic compound 2.5 mm thick including refletorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is excluisive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes. Rate are inclusive of all taxes, royalty etc. all T&P machine material and labour required for proper completion of work. SOR-20/19.01/New Item
Labour Cess will be paid extra as per applicable
GST will be paid extra as per applicable
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.97 MB
BOQ_2045962.xls
BOQ • 0.26 MB
PreQ_Main_MU.pdf
Tender Documents • 7.13 MB
706.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .