Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAdmitted-Fee/PreQual/Technical/Finance NO 18 DUVARAGAPILYAR KOIL STREET TIRUPATHUR 635601 | TIRUPATHUR | TAMIL NADU | 635601 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹14.4 L+₹28,776.24 (2.04%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹14.6 L+₹53,940.04 (3.83%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹14.8 L+₹71,598.02 (5.08%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹15.2 L+₹1.1 L (7.78%)Admitted-Fee/PreQual/Technical/Finance 1 56G AST PETROL BUNK ERODE BHAVANI PIRIVU ROAD RS SANKARI SALEM 637 302 | SANKARI | SALEM | TAMIL NADU | 637302 | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | A G ELAVARASAN L3 | S T S CONSTRUCTION L8 | G.Rajeshkumar L7 | R Muthusamy and Company L5 | Vijayakumar L2 | ANU CONSTRUCTION L1 | R.Jayalakshmi L6 | B.poongodi Construction L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of New 30000 Liter OHT(12m stagging) at Nayanacheruvu in Nayanacheruvu Panchayat | |||||||||||
| 2.00 | Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil | 54.34 | Cum | 216.3 ₹11,753.74 | 232.13 ₹12,613.94 | 185 ₹10,052.9 Lowest | 264.78 ₹14,388.15 | 212.61 ₹11,553.23 | 230 ₹12,498.2 | 226.85 ₹12,327.03 | 218.94 ₹11,897.2 |
| 3.00 | Sand filling for foundation with M sand including cost of sand,watering,ramming and consolidation etc complete as directed by Departmental officers | 3.46 | Cum | 1,535.4 ₹5,312.48 | 1,647.74 ₹5,701.18 | 1,520 ₹5,259.2 | 800 ₹2,768 Lowest | 1,509.18 ₹5,221.76 | 1,550 ₹5,363 | 1,462 ₹5,058.52 | 1,554.12 ₹5,377.26 |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 3.46 | Cum | 4,532.75 ₹15,683.32 | 4,864.38 ₹16,830.75 | 4,745 ₹16,417.7 | 5,272.39 ₹18,242.47 | 4,455.33 ₹15,415.44 Lowest | 4,850 ₹16,781 | 4,723.98 ₹16,344.97 | 4,588 ₹15,874.48 |
| 5.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||||||||
| 6.00 | (A). Below 1.5m from GL | 6.72 | Cum | 7,700.2 ₹51,745.34 | 8,263.62 ₹55,531.53 | 7,050 ₹47,376 | 8,950.63 ₹60,148.23 | 7,568.73 ₹50,861.87 | 6,450 ₹43,344 Lowest | 8,043.58 ₹54,052.86 | 7,794.1 ₹52,376.35 |
| 7.00 | (B). 0m to 1.50m below GL | 1.49 | Cum | 7,584.52 ₹11,300.93 | 8,139.48 ₹12,127.83 | 7,080 ₹10,549.2 | 8,811.86 ₹13,129.67 | 7,455.02 ₹11,107.98 | 6,550 ₹9,759.5 Lowest | 7,924.04 ₹11,806.82 | 7,677.01 ₹11,438.74 |
| 8.00 | (C). 0m to 1.00m above GL | 0.36 | Cum | 7,700.2 ₹2,772.07 | 8,263.62 ₹2,974.9 | 7,255 ₹2,611.8 | 8,811.86 ₹3,172.27 | 7,568.73 ₹2,724.74 | 6,700 ₹2,412 Lowest | 8,045.3 ₹2,896.31 | 7,794.1 ₹2,805.88 |
| 9.00 | (D). 1.00m to 4.50m above GL | 2.21 | Cum | 7,700.2 ₹17,017.44 | 8,263.62 ₹18,262.6 | 8,020 ₹17,724.2 | 8,952.93 ₹19,785.98 | 7,568.73 ₹16,726.89 | 7,100 ₹15,691 Lowest | 8,045.3 ₹17,780.11 | 7,794.1 ₹17,224.96 |
| 10.00 | (E). 4.50 m to 7.32 m above GL | 1.97 | Cum | 7,928.1 ₹15,618.36 | 8,508.17 ₹16,761.09 | 8,214 ₹16,181.58 | 9,230.82 ₹18,184.72 | 7,792.71 ₹15,351.64 | 7,450 ₹14,676.5 Lowest | 8,284.38 ₹16,320.23 | 8,024.75 ₹15,808.76 |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO BP
BDO BP
Tirupathur District - Construction of New 30000 litre OHT (12m staging) at Nayanacheruvu in Nayanacheruvu Panchayat at Natrampalli Block MLACDS - JPT -2026-27- Package - 02
2026_RDTN_716870_1
A2/2204/2026
Open Tender
Civil Works
Item Rate
180 days
Natrampalli Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹36,000
12 Nov 2026
23 Oct 2026
11 Nov 2026
23 Oct 2026
10 Nov 2026
23 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New 30000 Liter OHT(12m stagging) at Nayanacheruvu in Nayanacheruvu Panchayat | - | - | - | - |
| 2 | Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil | 54.34 | Cum | - | - |
| 3 | Sand filling for foundation with M sand including cost of sand,watering,ramming and consolidation etc complete as directed by Departmental officers | 3.46 | Cum | - | - |
| 4 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 3.46 | Cum | - | - |
| 5 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | - | - | - | - |
| 6 | (A). Below 1.5m from GL | 6.72 | Cum | - | - |
| 7 | (B). 0m to 1.50m below GL | 1.49 | Cum | - | - |
| 8 | (C). 0m to 1.00m above GL | 0.36 | Cum | - | - |
| 9 | (D). 1.00m to 4.50m above GL | 2.21 | Cum | - | - |
| 10 | (E). 4.50 m to 7.32 m above GL | 1.97 | Cum | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 4.64 MB
BOQ_861107.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .