| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC BAHRAICH | MAHARAJGANJ | UTTAR PRADESH | 273151 | ₹2.0 L | 1 | Accepted-AOC Due to AOC |
| 2 | 2₹2.2 LRejected-Finance | ₹2.2 L | 2 | Rejected-Finance due to highest rate |
| 3 | 3₹2.3 LRejected-Finance SOHGAURA CHAUK BAZAR MAHARAJGANJ UTTAR PRADESH | MAHARAJGANJ | MAHARAJGANJ | UTTAR PRADESH | ₹2.3 L | 3 | Rejected-Finance due to highest rate |
| 4 | 4₹2.3 LRejected-Finance 10 15 | AYODHYA | UTTAR PRADESH | 224001 | ₹2.3 L | 4 | Rejected-Finance due to highest rate |
| 5 | 5₹2.4 LRejected-Finance | ₹2.4 L | 5 | Rejected-Finance due to highest rate |
Tender Value
₹4.5 L
EMD Value
₹45,000
Closing Date
13 Jan 2026, 12:00 pmClosed
EE CD PWD maharajganj
EE CD PWD maharajganj
Patch Repair of ODR Road in Pharenda and Dhani G-6 of 11
2026_CEGKP_1103856_6
1805/A-11 Dt. 23-12-2025
Open Tender
Civil Works
180 days
Maharajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹767
₹45,000
Yes
23 Feb 2026
6 Jan 2026
13 Jan 2026
6 Jan 2026
13 Jan 2026
6 Jan 2026
Earthwork in cutting or in embankment in ordinary soil, excavation to be in the form or regular pits not exceeding 0.50m in depth and earthwork in embankment to be in 20 cm layers, including ramming & dressing the surface to required levels and slopes and also including lift up to 1.5 m and lead up to 30 m. The earth cutting to be used in making embankment or to banks within 30m (100 ft.) distance as directed by the Engineer - in - charge. As SOR No. 253 (For Road Patari) (GST will be paid extra as applicable) including labour cess.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause No. 404. (A) By Manual Means. (GST will be paid extra as applicable) including labour cess.
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site. Laying with 1% OPC cement and 3.5% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. as per Technical Specification Clause 406. (GST will be paid extra as applicable) including labour cess.
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 (Filling Pot-holes and Patch Repairs with open-Graded Premix surfacing, 20mm), compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (GST will be paid extra as applicable) including labour cess.
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 (Filling Pot-holes and Patch Repairs with Bituminous Concrete 40 mm), compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (GST will be paid extra as applicable) including labour cess.
Filling of Crack using slow curring bitumin Emulsion and apply crusher dust in case crack are wider than 3 mm. (Crack Filling) As per MoRTH S.No. 10.06 Reference to 3004.3.3 (GST will be paid extra as applicable) including labour cess.
Clearing jungle including uprooting of rank vegetations grass, bush, wood trees and saplings of grith upto 30 cm measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 m. out side the periphery of area cleared. as per SOR No. 259 (GST will be paid extra as applicable) including labour cess.
Empty Bag Filling by sand Supply and laying of sandy earth plastic cement bags (volume 0.035 cum) including cost of earth, co of empty bags, labour stiching with sutely complete laying and placing complete at the place of restoration of embankment (GST will be paid extra as applicable) including labour cess.
Empty Bag Filling by Earth Supply and laying of sandy earth plastic cement bags (volume 0.035 cum) including cost of earth, cost of empty bags, labour stiching with sutely complete laying and placing complete at the place of restoration of embankment (GST will be paid extra as per applicable) including labour cess.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.56 MB
Tendernotice_2.pdf
PDF • 0.92 MB
BOQ_2036054.xls
BOQ • 0.84 MB
Download all tender documents and submit your bid