Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹46.3 LAccepted-Finance CHUSHUL | LEH LADAKH | LADAKH | 194101 | 1st | Accepted-Finance Qualified |
Tender Value
₹40.7 L
EMD Value
₹81,500
Closing Date
1 Feb 2021, 4:00 pmClosed
Executive Engineer SSD Nyoma
Executive Engineer SSD Nyoma
Construction of Community Hall with Kitchen at Demjok
2020_PWD_1267_70
E-Tender of 04 SSD Nyoma 2020-21
Open Tender
Civil Works - Others
Item Rate
45 days
Demjok Nyoma
As per NIT
8 documents required · 8 mandatory
₹1,000
Executive Engineer SSD Nyoma
₹81,500
9 Feb 2021
22 Jan 2021
2 Feb 2021
22 Jan 2021
1 Feb 2021
22 Jan 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches, drains, pipes and cables etc. (not exceeding 1.5mtr in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5mtr including getting out excavated soil and disposal of surplus soil as directed, within a lead of 50 mtr. All kinds of soil
Ordinary rock
Dumping stone including cost of stones in Horizontal on level.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 fine sand : 8 graded stone aggregate 40mm nominal. Crushed
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with. cement mortar 1:6 (1 Cement: 6 coarse sand)
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement.1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Centring and shuttermg including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Lintels, beams, plinth beams, girders, bressumers and centilevers.
Suspended floors, roofs, landings, balconies and access platform.
Edges of slabs and breaks in floors and walls. Under 20cms wide
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Providing and fixing thermal insulation with Resin Bonded Fibre glass wool conforming to IS: 8183. Density 16 kg/m3, 50 mm thick, wrapped in 200G Virgin Polythene bags placed over existing false ceiling and held in position by criss-crossing Gl wire
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): First class kail wood.
Carriage of material by MT a) Cement/Steel an avg. lead of 317 kms
b) Sand an average lead of 10 Km
c) Stone aggregate an avg. Lead of 80 kms
d) Stone an avg. Lead of 10 kms
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .