| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.4 LAccepted-AOC | 1 | Accepted-AOC The lowest rate quoted by the contractor s.p.ravindhar | |
| 2 | 2₹6.6 L+₹16,905.99 (2.63%)Rejected-Finance | 2 | Rejected-Finance Admitted |
| Sl No | Description | Qty | Unit | M.MURUGAN L2 | s.p.ravindhar L1 |
|---|---|---|---|---|---|
| 1.00Construction of Public Toilet in Sirunagalur village at Sirunagalur Panchayat in Acharapakkam Panchayat Union in Chengalpattu District under 15th CFC District Panchayat Tied Sanitation -2025-26 Having Package NO: 02/ 2025-26. Estimate Amount : Rs.6.50 Lakhs | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 17.47 | cum | 275 ₹4,804.25 | 263 ₹4,594.61 Lowest |
| 3.00 | Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 4.94 | cum | 1,800 ₹8,892 | 1,736 ₹8,575.84 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 3 | cum | 5,500 ₹16,500 | 5,442 ₹16,326 Lowest |
| 5.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 0.76 | mt | 92,000 ₹69,920 | 91,858 ₹69,812.08 Lowest |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. Upto Basement | 4 | cum | 9,400 ₹37,600 | 9,326 ₹37,304 Lowest |
| 7.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. Above Basement | 1.96 | cum | 9,500 ₹18,620 | 9,467 ₹18,555.32 Lowest |
| 8.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Upto basement | 25.23 | sqm | 550 ₹13,876.5 | 547 ₹13,800.81 Lowest |
| 9.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Above basement | 27.72 | sqm | 1,100 ₹30,492 | 1,095 ₹30,353.4 Lowest |
| 10.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum Belove Basement | 4.77 | cum | 6,250 ₹29,812.5 | 6,144 ₹29,306.88 Lowest |
Tender Value
₹6.5 L
EMD Value
₹6,500
Closing Date
12 Nov 2025, 3:00 pmClosed
Block Development Officer (BP) Acharapakkam
Block Development Office (BP) Acharapakkam
Construction of Public Toilet in Sirunagalur village at Sirunagalur Panchayat in Acharapakkam Panchayat Union in Chengalpattu District under 15th CFC District Panchayat Tied Sanitation
2025_RDTN_620259_1
DIPR/248/CDP A2
Open Tender
Civil Works
Item Rate
90 days
Sirunagalur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,500
Yes
Block Development Office (BP) Acharapakkam
7 Jan 2026
5 Nov 2025
12 Nov 2025
5 Nov 2025
12 Nov 2025
5 Nov 2025
5 Nov 2025
Amount
Construction of Public Toilet in Sirunagalur village at Sirunagalur Panchayat in Acharapakkam Panchayat Union in Chengalpattu District under 15th CFC District Panchayat Tied Sanitation -2025-26 Having Package NO: 02/ 2025-26. Estimate Amount : Rs.6.50 Lakhs
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. Upto Basement
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. Above Basement
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Upto basement
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Above basement
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum Belove Basement
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum Above Basement
Filling with excavated earth with cost and conveyance including all other labour charges etc complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering in cm 1:5 mix of 12mm thick with cost and conveyance including all other labour charges etc complete
Supplying and fixing of steel door including all other charges etc complete(1.00mx2.10 m)
Supplying and fixing of steel door including all other charges etc complete(1.10mx1.80 m)
Supplying and fixing of steel door including all other charges etc complete(0.75mx1.80 m)
Supplying and fixing of RCC Jolly including all other charges etc complete
Providing granolothic floor finish CC 1:2:4 mix with cost and conveyance including all other labour charges etc complete
Supply and fixing of metal corrugated sheet of 6m thick with cost and conveyance including all other labour charges etc complete
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.
Dadooing of walls with Printed design glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 -10Sqm.
Supplying and Fixing of European Water closet with "P" or " S" Trap and with ISI mark. The cost is includs of double flapped PVC seat cover, PVC pipe 110mm dia and all internal fittings and with necessary CI Brakets 12mm brass nipple 15mm dia chromium plated broiwn headwd stop cock of approved quality with ISI mark and nylon connection including fixing the same to wall and giving nessary water supply connection to the European water closet with 12.50 lits capacity porcelin low level flushing Tank with all internal fittings. The European water closet should be fixed on the floor using counter sunk bolts and nuts and necessary teak wood plugs, clamps screws etc., including dismantling the floor or wall wherever necessary and redoing the same to their original condition etc., as per standared specification etc complete.
Supplying and fixing in positon Indian Water Closet (Oriya type) of size 580 x 440mm colour glazed earthern ware of approved quality and brand with "P" or "S" trap conforming to BIS with Sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5 (One lime, Two Sand and Five brick jelly) 100mm thick and finishing the top to the required slope and including giving necessary connection to PVC pipes (including the cost of 110mm dia PVC pipe for a length of 600mm) by dismantling brick masonry wall / reinforced cement concrete roof / floor slab and making good the dismantled portion to the original condition with leakages etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and Fixing of Hand wash basin of size 550 x 400 mm (without pedastal) necessary cast iron bracket 15mm dia chromium plated pillar tap 32mm dia ' B' class GI waste pipe 32mm chromium plated brass waste coupling with rubber plug and chain 15mm dia nylon connection etc., including fixing the wash hand basin in possition including cost of teak wood plugs screws rubber washer, white lead and giving water supply connection testing for leakage etc. complete as per standared specification etc complete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Supply and fixing of 500 ltrs syntex tank etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.MURUGAN (BID ID -1508703)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_741695.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_741695.xls
BOQ • 0.31 MB
NIT.pdf
Tender Documents • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .