Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.2 LAdmitted-Finance THANA ROAD LEDO TINSUKIA ASSAM 786182 | TINSUKIA | ASSAM | 786182 | -42.50% | ₹45.2 L | L1 | Admitted-Finance |
Tender Value
₹92.7 L
EMD Value
₹1.2 L
Closing Date
21 Apr 2026, 9:00 amClosed
GENERAL MANAGER
OFFICE OF THE GENERAL MANAGER, NEC, CIL, MARGHERITA
Arrangement of top soil and preparation of benches including digging of plantation pits at Tirap West
2026_NEC_350744_1
NEC/CIL/MRG/ET/494
Open Tender
Civil Works - Others
Percentage
150 days
TIRAP COLLIERY
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.2 L
1 Aug 2026
1 Apr 2026
22 Apr 2026
1 Apr 2026
21 Apr 2026
1 Apr 2026
1 Apr 2026 - 13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil with Dozer with lead upto 100 Mt (Excavation for road way in soil by mechanical means including cutting and pusshing the Earth to site of embankment upto a distance 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross section. | - | Cum | - | - |
| 2 | Loading and unloading by mechanical means (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haultage and return trip) | - | Cum | - | - |
| 3 | Cost of Haulage Excluding Loading and Unloading. (iii) Katcha Track and Track in river bed/nallah bed and choe bed. Considering 8 km carriage | - | Cum/Kg | - | - |
| 4 | Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column, steps, septic tank etc including refilling the quantity as necessary after completion of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of surplus earth with all lead and lift as directed and specified in the following classification of soils includig bailing out water where necessary as directed and specified ( In hard/ Dense soil) For 3 Hectare Level Area @ 2000 | - | Cum | - | - |
| 5 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.59 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_370757.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .