Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.0 LAdmitted-Finance SUB DISTICT HOSPITAL HANDWARA 1 37 BARAMULLA HANDWARA HANDWARA HANDWARA HANDWARA KUPWARA JAMMU KASHMIR 193221 | KUPWARA | JAMMU AND KASHMIR | 193221 | -0.10% | ₹20.0 L | L1 | Admitted-Finance |
| 2 | L2₹20.2 L+₹22,002.38 (1.10%)Admitted-Finance | +1.00% | ₹20.2 L+₹22,002.38 (1.10%) | L2 | Admitted-Finance |
| 3 | L3₹21.0 L+₹1.0 L (5.11%)Admitted-Finance | +5.00% | ₹21.0 L+₹1.0 L (5.11%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Technically Bid Rejected |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Technically Bid Rejected |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
3 Aug 2026, 4:00 pmClosed
Executive Engineer ED Kupwara
Office of the Executive Engineer ED Kupwara
Renovation and Modernization of Distribution Sub-Stations for ED-Kupwara
2026_PDD_315815_1
ED/Kup-11 of 2026-27
Open Tender
Electrical Works
Percentage
60 days
Kupwara
Refer to SBD
2 documents required · 2 mandatory
₹1,000
Executive Engineer ED Kupwara
₹40,000
29 Aug 2026
13 Jul 2026
4 Aug 2026
17 Jul 2026
3 Aug 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply,Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site (including Head load) and erection of 9 Mtr. Long Poles (ST-410, SP-33) with pit excavation, refilling the pit with soil, boulders as per REC Standard. | 22 | No. | 18,476 | ₹4,06,472 |
| 2 | Supply,Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site (including Head load) and erection of 8 Mtr. Long Poles (ST-410, SP-15) with pit excavation, refilling the pit with soil, boulders as per REC Standard. | 4 | No. | 14,150 | ₹56,600 |
| 3 | Supply , Carriage upto site , Laying , stringing, tensioning and binding of 30 mm2 ACSR Conductor (Weasel) , including joints by PG clamps wherever required as per REC standard. | 0.4 | Kms | 42,500 | ₹17,000 |
| 4 | Cement bottoming of S T poles in 1:2:4 mix as per REC standard 0.48 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete.For 9 Mtr Poles | - | No. | 3,524 | - |
| 5 | Cement bottoming of S T poles in 1:2:4 mix as per REC standard 0.40 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete.For 8 Mtr Poles | - | No. | 2,941 | - |
| 6 | Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality. | - | No. | 824 | - |
| 7 | Supply and fixing of pole Earthing by G.I pipe 40 mm dia or G.I rod 20 mm , 3 mtr long through GI strip 25x3mm. | - | No. | 2,233 | - |
| 8 | Supply , installation ,testing & commissioning of Iron GI Channel/Angle/Flat of sizes including clamps for Transformer Pad/G.I Channel Bedding/Frame ,L.A Set/G.O Set/Horn Gap as per specification ( as per site Requirement) | 2,530 | Kgs | 151 | ₹3,82,030 |
| 9 | Supply , Installation ,testing & commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type as per REC standard | 11 | set | 12,096 | ₹1,33,056 |
| 10 | Supply , installation ,testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A confirming to ISI specification | 11 | set | 5,789 | ₹63,679 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
Tendernotice_2.pdf
PDF • 0.40 MB
SBD.pdf
Tender Documents • 1.90 MB
BOQ_1026268.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .