| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAccepted-AOC | ₹4.9 Cr Quoted ₹5.0 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹5.5 Cr+₹53.8 L (10.8%)Rejected-AOC NA | ₹5.5 Cr+₹53.8 L (10.8%) | L2 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹7.1 L
Closing Date
22 Jan 2021, 4:00 pmClosed
BP Sharma
PHED No 2 Rohtak
Design construction erection testing commissioning of 2 point 50 MLD Sewage Treatment Plant based on Sequential Batch Reactor SBR Technology complete in all respect including MPS with peak factor 3 landscaping all civil Electrical
2021_HRY_155630_1
RecallPROVIDING SEWERAGE SYSTEM IN VILLAGE NINDANA
Open Tender
Civil Works
Works
365 days
Rohtak
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
Yes
₹7.1 L
Yes
18 Feb 2021
7 Jan 2021
22 Jan 2021
7 Jan 2021
22 Jan 2021
7 Jan 2021
Amount
MAIN PUMPING STATION 1 Job Complete Job Design, construction, erection, testing & commissioning of 2.5 MLD capacity MPS with peak factor 3 including screening chamber, wet well sump, suitable size of 2 mechanical coarse screens (1 W + 1 SB), Suitable size 3 Nos. CI Gear operated sluice gate with SS spindle (SS 410) and seats (SS 304) 2 Nos for screens and 1 no. for partition of collecting tank. Providing and installing 1 No. 1800 LPM 35 mtr. Head, 1 no. 3600 LPM 35 m head, 1 no. 5400 LPM 35 m head non clog sewage pumping sets, MCC panel, entire cable network, all other electrical , Mechanical, Piping & Instrumentation work including O & M for 12 months during defect liability period after trail run 3 month and 5 years thereafter
SEWERAGE TREATMENT PLANT 1 Job Complete Job Design, construction, erection, testing & commissioning of 2.50 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect, mechanical fine screen. Landscaping, disposal of treated effluent through open channel into nearby drain, MCC Panel Room & all other contingent Electrical, Mechanical, Piping & Instrumentation work, online monitoring system for effluent quality etc. With PLC & SCADA Arrangement for STP integrated with MPS including furniture & laboratory equipments as per detail given in the bid document and following components including O & M for 12 months during defect liability period after trail run 3 month and 5 years thereafter i) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 4 No. LED energy efficient lamps on each pole. (ii) Supply and installation of 1 no. SS main Gate of SS-304 Grade 3.65m. wide main gate and 1.20m. wide wicket gate (total weight not less than 500 kg) at STP site. (iii) Supply and installation 2 Nos. fine Screens of suitable size as per design for 2.50 MLD average flow with peak factor of 3 (iv) Providing and installing 2 No. centrifuges (1Working + 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect including packing dry sludge in 20 Kg. bag and supplying the same to market Kisan Sewa Kendra or as directed by Engineer-in-charge within the lead as pointed at clause 4.4.4 of the NIT, including O & M for 12 months during defect liability period after trail run 3 month and 5 years thereafter
Design, Supply & Erection of copper wound outdoor type Transformers of required KVA as mentioned below on load tap changer or suitable capacity on higher side of standard make outdoor type, VCB Panel, G.O. Switch, H.T. Metering Panels, APFC Panels along with for each Transformer, 11KV Substation, entire cable network from G.O. Switch to H.T. Metering equipment and from H.T. Metering to Transformer Main to L.T. Panel, Earthing, safety equipment and any other contingent thereto complete in all respect as per DNIT and getting it passed from Chief Electrical Officer including operation & Maintenance of 5 Years. At STP = 160 KVA
Design, Supply & Erection of DG Sets of required KVA as mentioned below suitable capacity on higher side capacity with Acoustic Canopy, AMF Panel and Copper Earthing of suitable rate with change over switch & synchronizing panel complete as per DNIT including operation & Maintenance of 5 Years. At STP = 160 KVA
CCTV CAMERAS 1 Job Complete Job Providing and installing 5 CCTV Cameras ( 3 cameras for STP and 2 Cameras for MPS). Complete as per satisfaction of the Engineer-in – charge within 96 hours of signing the arrangement along with 90 days recording (DVR), 32 inch LED Screen, 16 channel DVR at STP site and 8 channel DVR at MPS site with connectors, cables, poles and power supply with online real time output facility. The cameras at both the sites i.e MPS and STP shall be synchronized at STP site. CAMERAS: i) 3 no. PTZ speed dome 360 degree 50x zoom camera, ii) 2 no. cameras each 12 mm lense size. MAKE: Sony/ Canon/ Panasonic/ Samsung. CCTV Cameras should be installed and commissioned before starting execution of work including O & M for 12 months during defect liability period after trail run of 3 month and 5 year thereafter :-
Construction of HT / LT Panel room, MCC panel room, PLC room, Centrifuge house, blower room, laboratory with equipments / furniture, office building, toilet, Lobby including all Sanitary fittings etc. as per drawings covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated alluminium frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame with 5mm thick glass AIS/Saint Gobain/ Modi Float Covered Area (200 sqm) including O & M for 12 months during defect liability period after trail run of 3 month and 5 year thereafter :-
Bidder Name
Amount
SFA and Associates(GSTN-07AGAPA8638G1ZL)
Sh. Ashok Kumar Sindhu(GSTN-NA)
Sh. Ashok Kumar Sindhu
SFA and Associates
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .