Loading…
Loading…
Tender Value
₹19.2 L
EMD Value
₹33,000
Closing Date
13 Jul 2026, 3:00 pm5d left
Running Maintenance of PLC System
9498289
GEM/2026/B/7691251
Two Packet Bid
Running preventive and breakdown maintenance of PLC control system with Electrical drives all Contr
Sonbhadra, Uttar Pradesh
Total value wise evaluation
BOQ
5 documents required · 5 mandatory
3 yrs
₹10 L
₹10 L
80%
Dy CAO CFA and BO BTPS OBRA, BTPS OBRA SONBHADRA, (Dy Cao Cfa And Bo Btps Obra)
₹33,000
27 Jun 2026
27 Jun 2026
13 Jul 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Running preventive and breakdown maintenance of PLC control system with Electrical drives all Control and instrumentation system of ASH handling | Running preventive and breakdown maintenance of PLC control system with Electrical drives all Control and instrumentation system of ASH handling | 6 | Numbers | ee_cimd2_btps_obra | 180 |
| 2 | Replacement New Erection of impulse line | Replacement New Erection of impulse line | 100 | Numbers | ee_cimd2_btps_obra | 180 |
| 3 | Replacement New Erection of instrument fitting adopter nut tails Elbow connector etc | Replacement New Erection of instrument fitting adopter nut tails Elbow connector etc | 25 | Numbers | ee_cimd2_btps_obra | 180 |
| 4 | Overhauling B 501 and B 601 SS cock valve | Overhauling B 501 and B 601 SS cock valve | 25 | Numbers | ee_cimd2_btps_obra | 180 |
| 5 | Overhauling Repairing of Junction Boxes | Overhauling Repairing of Junction Boxes | 25 | Numbers | ee_cimd2_btps_obra | 180 |
| 6 | Servicing recalibration Erection of Fuzi Yokogava Rosemount etc Transmitters | Servicing recalibration Erection of Fuzi Yokogava Rosemount etc Transmitters | 5 | Numbers | ee_cimd2_btps_obra | 180 |
| 7 | overhauling and Recalibration New erection of digital Indicators | overhauling and Recalibration New erection of digital Indicators | 8 | Numbers | ee_cimd2_btps_obra | 180 |
| 8 | Overhauling and Recalibration Erection of Flow meter conductivity meter | Overhauling and Recalibration Erection of Flow meter conductivity meter | 10 | Numbers | ee_cimd2_btps_obra | 180 |
| 9 | Complete overhauling Erection of level switches | Complete overhauling Erection of level switches | 5 | Numbers | ee_cimd2_btps_obra | 180 |
| 10 | Replacement of Pressure switch Gauge Vibration switch | Replacement of Pressure switch Gauge Vibration switch | 40 | Numbers | ee_cimd2_btps_obra | 180 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9498289.pdf
GEM_BID • 0.30 MB
atc_common_bop_2026-06-20-14-53-19_c885add3324a88530cc4d7b9849c47a7.pdf
BOQ • 0.76 MB
boq_commonbop_2026-06-20-14-53-19_94da512ab3683ad817ff4769df635abe.csv
BOQ • 0.01 MB
ATC_5e49410b-8042-4019-938b1782288554603_ee_cimd2_btps_obra.pdf
GEM_OTHER • 0.76 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid