Tender Value
₹1.6 Cr
EMD Value
₹3.1 L
Closing Date
25 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
DRM WA
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a)The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (i)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note: for b (i) separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (ii)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (iii) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contract or through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing.
However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Similar Nature of work: - Any civil engineering work.
2 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/ We have visited the works site and I / We am / are aware of the site conditions.
ADEN/AWR Subdivision:- Improvement to road surface, drainage system and ancillary works at RUBs
ENGG-JP-2026-27-08R~NWR
ENGG-JP-2026-27-08R
Open
Works - General
8 Months
Jaipur, Rajasthan
₹0
₹3.1 L
31 Aug 2026
31 Aug 2026
11 Sept 2026
27 items across 2 schedules · ₹2,20,70,119.5 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 10 | 7,294.7 | 72,947 |
| 2 | cum | 160 | 8,424.6 | 13,47,936 | |
| 3 | Well steining | Sqm | 800 | 263.65 | 2,10,920 |
| 4 | Thermo-Mechanically Treated bars of grade Fe- 500D or more. | Kg | 10000 | 107.85 | 10,78,500 |
| 5 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | Kg | 7700 | 133.7 | 10,29,490 |
| 6 | Hot finished welded type tubes | Kg | 68000 | 194.4 | 1,32,19,200 |
| 7 | Providing and fixing bolts including nuts and washers complete. | Kg | 50 | 159.35 | 7,967.5 |
| 8 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05 mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer- in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | Sqm | 2100 | 738.65 | 15,51,165 |
| 9 | On concrete work | Sqm | 2200 | 235.15 | 5,17,330 |
| 10 | Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture | Sqm | 1000 | 226.25 | 2,26,250 |
| 11 | 600 mm dia RCC pipes. | Metre | 20 | 3,401.25 | 68,025 |
| 12 | 300 mm dia | Metre | 1200 | 707.75 | 8,49,300 |
| 13 | 300 mm dia | Metre | 600 | 825.7 | 4,95,420 |
| 14 | Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in- charge. | cum | 10 | 1,509.8 | 15,098 |
| 15 | Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. | cum | 10 | 1,538.25 | 15,382.5 |
| 16 | Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all complete as per direction of Engineer -in-charge. | cum | 30 | 1,538.25 | 46,147.5 |
| 17 | Gravel packing in tubewell construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer-in-charge. | cum | 20 | 2,024.5 | 40,490 |
| 18 | 200 mm nominal size dia having minimum wall thickness 5.40 mm | Metre | 400 | 2,442.75 | 9,77,100 |
| — | 400.00 | 210.9 | 84,360 | ||
| — | 500.00 | 347.78 | 1,73,890 | ||
| — | 50.00 | 864.02 | 43,201 | ||
| Schedule total | ₹2,17,68,668.5 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
2026-27-08R.pdf
ATTACHMENT
Tenderspecialcondition-08R.pdf
ATTACHMENT
Correction slip 12 of GCC 2022
ATTACHMENT
11.Correctionslip11GCCworks-2022.pdf Correction slip 11 of GCC 2022
ATTACHMENT
GCC April2022 with correction slip
ATTACHMENT
CableCutletterofHQ_compressed1.pdf
ATTACHMENT
HQletterforbrandmaterialofworks.pdf
ATTACHMENT
HQ letter for Agreement
ATTACHMENT
HQletterforAgreementin45daysdated07-11-2024.pdf
ATTACHMENT
10.GCC-2022-ACS10-updated_compressed.pdf
ATTACHMENT
11.Correctionslip11GCCworks-2022.pdf
ATTACHMENT
13.Correctionslip12GCCworks-2022_compressed.pdf
ATTACHMENT
HQletterforAgreementin45daysdated07-11-2024.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].