| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.9 LAccepted-Finance | ₹86.9 L | L1 | Accepted-Finance Accepted Being Lowest RATE |
| 2 | L2₹87.1 LRejected-Finance | ₹87.1 L | L2 | Rejected-Finance REJECTED Being HIGHER RATE |
Tender Value
₹87.3 L
EMD Value
₹6.4 L
Closing Date
17 Mar 2026, 12:00 pmClosed
office of the se.ayo.ambe.circle.pwd.ayodhya
office of the se.ayo.ambe.circle.pwd.ayodhya
Vikas Khand Tarun Ke Gram Sabha Hathigo Majra Paraspur Kurebhar Bhiti Haiderganj Marg Ke Km 6 se Bayen Para School Ke Samne se Paraspur Gaon tak nirman karya.
2026_CEUFZ_1123330_4
958/02kamAyoAmbeCircle/2026 Dt 12.02.2026
Open Tender
Civil Works - Roads
180 days
office of the se.ayo.ambe.circle.pwd.ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.4 L
Yes
office of the se.ayo.ambe.circle.pwd.ayodhya
24 Apr 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
11 Mar 2026
Earth work in embankment in ordinary soil including lift upto 1.50 mtr. and lead up to 30.00 mtr. and also including ramming dressing the surface to required level and slope as per direction of E/I.
Earth work in excavation in trench for foundation in ordinary soil i/c lift upto 1.50 mtr. & lead upto 50.00 mtr. And dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed bu the E/I within a distance of 50 m.
Construction of granular sub-base by providing Well graded material Grading-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Smooth wheel roller to achieve the desired density, complete as per technical clause 401
Providing, laying, spreading and compacting stone aggregates of 45-63 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming crushable Stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone dust to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405.
Brick edging 7 cm wide on both sides of the road by S.O. Bricks complete as per PWD detailed specification no 20.15
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen using distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat Type C as per Technical Specification Clause 508.
Providing and laying seal coat by manual means with VG-10 bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510
Earth work in Both side Patri.in ordinary soil including lift upto 1.50 mtr. and lead up to 30.00 mtr. and also including ramming dressing the surface to required level and slope as per direction of E/I.
Construction of 900mm dia NP-3 Hume pipe i/c all labour, material T&P etc complete as per direction of E/I.
Construction of 350mm dia NP-3 Hume pipe i/c all labour, material T&P etc complete as per direction of E/I.
Providing & laying in cement concerete 1:3:6( 1 cement : 3 Coarse sand : 6 Stone aggregate 40 mm.nominal size) and curing complete, including supply of all materials, labour and T&P etc. required for proper completion of work as per direction of E/
Class-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth i/c supply of all material, labour, curing and tools and plants etc. required for proper completion of the work.
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Plain Cement Concrete in Open Foundation Complete as per Drawing and Technical Specification PCC Grade M-15 Using batching plant transit mixer & manual placing.
Plain Cement Concrete in Open Foundation Complete as per Drawing and Technical Specification PCC Grade M-30 Using batching plant transit mixer & manual placing.
Brick masonry work in cement mortar 1:3 in Super structure complete excluding pointing and plastering, as per drawing and Technical Sperifications.
R.C.C. M20 grade in Slab and bed block in Super structure as per technical drawing and specification. (Deck Slab)
R.C.C. M20 grade in Slab and bed block in Super structure as per technical drawing and specification. (Deck Slab)
Supplying, fitting and placing un-coated HYSD Bar reinforcement complete as per drawing and technical specification
Providing weep holes in brick masonry / plain / reinforced concrete abutment, wing wall / retrun wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of IV:20H towards drawing foce, complete as per drawing and technical specifications.
Struck Pointing on brick work with cement mortal 1:3 (1Cement : 3 sand)
Back filling behind abutment, wing wall and retaining wall complete as per drawing and technical specification clause 710.1.4.of IRC:78 & 2200
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 1St Year Maintenance Cost @ Charge - 0.00% (Total Cost of Item nos. 1 to 15)
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period wwhhiicchh bbeeggiinnss ffrroomm tthhee aaccttuuaall CCoommpplleettiioonn DDaattee aanndd ends after five years.(including cost of material T&P labour but excluding GST) 2nd Year Maintenance Cost @ 0.75% (Total Cost of Item nos. 1 to 15)
The routine maintenance of above road work including earthen shoulder, and bituminous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 3rd Year Maintenance Cost @ 1.50% (Total Cost of Item nos. 1 to 15)
The routine maintenance of above road work including earthen shoulder, and bituminous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) 4th Year Maintenance Cost @ 2.25% (Total Cost of Item nos. 1 to 15)
The routine maintenance of above road work including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period wwhhiicchh bbeeggiinnss ffrroomm tthhee aaccttuuaall CCoommpplleettiioonn DDaattee aanndd ends after five years.(including cost of material T&P labour but excluding GST) 5th Year Maintenance Cost @ 3.00% (Total Cost of Item nos. 1 to 15)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_2093046.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid