| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹24.9 L+₹2,949.22 (0.12%)Rejected-Finance | L2 | Rejected-Finance Accepted |
| Sl No | Description | Qty | Unit | Suruthi Contractor L1 | RADHIKA VBR CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation and depositing on bank wiyh initial lead of 10m and lift of 2m
in the following classification of soils as directed by TWAD Board officers. | 128 | M3 | 263.78 ₹33,763.84 Lowest | 273.15 ₹34,963.2 |
| 2.00 | Second Depth. OF 2m
from 2m to 4m below GL
For column footing | 25.6 | M3 | 275.39 ₹7,049.98 Lowest | 285.15 ₹7,299.84 |
| 3.00 | Sand filling for foundation with clear river sand
including cost of sand watering, ramming and
consolidation etc complete as directed by
Department officers. | 9.6 | M3 | 2,141.23 ₹20,555.81 Lowest | 2,141.23 ₹20,555.81 Lowest |
| 4.00 | C.C.1:4:8 Mix using 40mm iss metal for leveling course including cost of mixing
concrete, ramming, curing etc. | 9.6 | M3 | 5,907.62 ₹56,713.15 Lowest | 5,907.62 ₹56,713.15 Lowest |
| 5.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical viarator, finishing, curing etc.,
complete as directed by TWAD Board officers. | 34.66 | M3 | 9,442.61 ₹3,27,280.86 Lowest | 9,442.61 ₹3,27,280.86 Lowest |
| 6.00 | For items 0 to 1.50m below GL | 2.53 | M3 | 9,442.61 ₹23,889.8 Lowest | 9,442.61 ₹23,889.8 Lowest |
| 7.00 | For items 0 m to 4.5m above GL | 3.79 | M3 | 9,583.68 ₹36,322.15 Lowest | 9,583.68 ₹36,322.15 Lowest |
| 8.00 | For items 4.51 m to
7.32m above GL. | 2.97 | M3 | 10,417.35 ₹30,939.53 Lowest | 10,417.35 ₹30,939.53 Lowest |
| 9.00 | For items 7.32m 10.98m above GL | 3.38 | M3 | 10,695.22 ₹36,149.84 Lowest | 10,695.22 ₹36,149.84 Lowest |
| 10.00 | For items 10.98m to
14.64m above GL | 15.59 | M3 | 10,695.25 ₹1,66,738.95 Lowest | 10,695.25 ₹1,66,738.95 Lowest |
Tender Value
₹29.5 L
EMD Value
₹29,500
Closing Date
31 Jan 2026, 10:00 amClosed
BDO (VP) Cuddalore
Block Development office Cuddalore
Construction of New OHT 60000 ltr in Sooriyanpettai in Kumalankulam Panchayat
2026_RDTN_647458_4
B4/073/2025-26 14th fc
Open Tender
Civil Works - Others
Item Rate
90 days
Block Development office Cuddalore
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹29,500
Yes
2 Feb 2026
27 Jan 2026
31 Jan 2026
27 Jan 2026
31 Jan 2026
27 Jan 2026
Earthwork Excavation and depositing on bank wiyh initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers.
Second Depth. OF 2m from 2m to 4m below GL For column footing
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers.
C.C.1:4:8 Mix using 40mm iss metal for leveling course including cost of mixing concrete, ramming, curing etc.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical viarator, finishing, curing etc., complete as directed by TWAD Board officers.
For items 0 to 1.50m below GL
For items 0 m to 4.5m above GL
For items 4.51 m to 7.32m above GL.
For items 7.32m 10.98m above GL
For items 10.98m to 14.64m above GL
For items 14.64m to 18.3m above GL
Supplying Fabricating and Placing in Possition of HSD Steel rods for Reinforcement including cost of Steel and binding wire etc.
Supplying and Erecting Steel Centering for sides and soffits including necessary supports and shuttering to the required height for R.C.C. ITEM Using M.S.Sheets including labour charges etc.
For Brace II 5.3. to 6.30 m
Deduct for Jn of sidewall
For brace sides inner
11.30 to 12.30m above GL
For Floor Beam and Bottm of Floor slab Curved surface
Sides of roof slab
0m to 3.30m above and below Gl Deduct brace jn
Deduct brace Jn 8.31m to 9.30m
Painting two coats with approved Cement Paint over one coat of Priming coat over cement plastered surface of the Reservoir including cleaning, preparingthe surface etc.
Fabrication, supply,delivery and fixing of out side MS Ladder of 45cm wide made out of 50x50x6 mmMS angle for sides and steps in 16mm MS Plain rod fixed at 30cm centre tocentre welded, jointedetc,Providing with suitable side supports, clamps, and locking arrangements provided with one coat of red oxide paint etc.
Providing and fixing of R.C.C. inner access ladder in R.C.C. 1:1.5:3 mix using 20mm ISS Metal including cost of reinforcement ,placing in grill in possition ,centering,shuttering charges mixing concrete curing etc.
Providing Ac vent cowl arrangements mosquito proof nylon net with 110mm dia Cowl etc.
Providing Cut Stone Slab in cm 1:3 mix
Providing man hole cover of size 0.60x0.60 in R.C.C. 1:1.5:3 mix with suitable reinforcement, 50x50x6mm MS Angle fixed along edges etc.
Provision for pipe connection arrangements for inlet, outlet, scour and overflow etc., including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc. complete as detailed below. 65mm dia GI pipes for inlet connection.
65mm dia GI elbow
65mm dia GI Flange set
65mm dia GI coupling
80mm dia GI pipes
90mm dia PVC Threaded coupler
80mm dia GI Tee
80mm dia GI elbow
80mm dia GM Gate valve
80mm dia GI Flange set
80mm dia GI coupling
80mm dia GI Dummy
Labour charges for GI pipe connection to the OHT , for inlet,outlet,overflow and scour arrangements including cutting and threading earth work excavation and refilling
Providing hand rails over the roof slab by using 32mm GI pipe with 40mm x 6mm MS flat and fixed with 12mm dia fastner bolt 75mm long and as directed by TWAD officers
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers. As per item l(a) + l(b) Less item 2,3 & 4A & 4B Total
Construction of Plat form
Provision for Pipe line Arrangements
Provision for Name board
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_776375.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_776375.xls
BOQ • 0.33 MB
sooriyanpettaikumalkulam.pdf
Tender Documents • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .