| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹8.0 LAdmitted-Finance | -20.00% | ₹8.0 L | H1 | Admitted-Finance |
| 2 | H1₹8.0 LAdmitted-Finance | -20.00% | ₹8.0 L | H1 | Admitted-Finance |
| 3 | H2₹7.9 LAdmitted-Finance | -20.69% | ₹7.9 L | H2 | Admitted-Finance |
| 4 | H3₹7.8 LAdmitted-Finance | -22.03% | ₹7.8 L | H3 | Admitted-Finance |
| 5 | H4₹7.5 LAdmitted-Finance | -24.99% | ₹7.5 L | H4 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
12 Jan 2026, 4:00 pmClosed
Executive Engineer PWD Division Gandoh
Executive Engineer PWD Division Gandoh
Construction of covered RCC drain at km 1st RD(700-800) on Changa Kahaljugaser Road Permanent restoration.
2026_PWDJK_299669_8
E-NIT 51 of 2025-26
Open Tender
Civil Works
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Division Gandoh
₹20,000
20 Jan 2026
2 Jan 2026
13 Jan 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
2 Jan 2026 - 9 Jan 2026
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge:1:3:6 or richer mix (i/c equivalent design mix
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil
Dry Stone pitching any thickness incl. Cost of stone in horizontal level
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms.
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Carriage of stone fom an average distance of 1Km by MT
Carriage of sand from an average distance of 30 Km by MT
Carriage of Bajree from an average distance of 30 Km by MT
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_972450.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid