BDO(BP)
Thirumangalam Union Office
Madurai District Renovation of PUPS TWO class Room Building (RCC building) Alapalachery village and Alapalachery Panchayat in Thirumangalam Block
2025_RDTN_583019_1
01-TMM SIUS-2025-2026
Open Tender
Civil Works
Works
120 days
Thirumangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,720
29 Jul 2025
18 Jul 2025
22 Jul 2025
18 Jul 2025
22 Jul 2025
18 Jul 2025
Amount
Dismantling,clearing away and from useful for re use for any thickness of walls for Clean removal of cement plaster from walls (Sch No.320) P28
Chipping of concrete & roughening the surface (Page - 22 SI No.31 - 38A)
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Brickwork in cement mortar 1:5 mix using country bricks incuding cost, conveyance of all materials to work site and all labour charges etc., complete.
Cost, Supply and Fixing of Cudappah slabs for cupboard and rack arrangements incuding cost, conveyance of all materials to work site and all labour charges etc
R.R.Pointing with CM 1:3 mix, including cost, conveyance and all labour charges etc., completed.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Pointing for Pressed tiles, Marble slab and ornamental tiles with CM 1:3 (sch. Item no. 328)
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly clean out of dust and scrubbing. The surface shall then be allowed to dry for atleadt 48 hours. It shall then be sand papered (water proof abrasive sheet) to give a smooth and even surface. Anyunevenness shall be made good by applying Ist coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of Ist coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothl, etc., complete complying with standard specifications and directed by the Department officers. (The rates are inclusive of hire charges for grinding machine with wheel, coat of sand paper (waterproof abrasive sheet), cost of putty blade ,labour charges for grinding the jointsand sand papering, two coat of putty,scrapping the putty area to level the surface smooth,etc.,complete).
White washing two coat using best freshly burnt white shell lime in all the floors, including cost of lime, fevical type gum, brushes,scaffolding charges etc,complete
Painting two coats with Oil bound Distemper over old white wash surface ,ceiling by through Scrapping of old plastered surface over priming coat etc.complete.
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat ,inculding through scrapping, clean removal of dirt etc. complete and inculding necessary plasterof paris , putty whereever required .
Painting old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Painting two coats with approved black oxide for old Black board over the cement platered surface
Provision for Cupboard Door
Provision for Repair doors & windows
Provision for Bala Painting
Provision for Rainwater Arrangements charges ( 2 Nos)
Provision for Name board
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .