| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹2.1 L+₹9,550 (4.79%)Rejected-Finance | L2 | Rejected-Finance HIGHEST | |
| 3 | L3₹2.1 L+₹10,607 (5.32%)Rejected-Finance | L3 | Rejected-Finance HIGHEST |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
10 Jun 2022, 1:00 pmClosed
SE EDC-I, Mathura
Near Kali Mandir, Mathura Cantt, Mathura
Proposed work for Construction of 11KV/LT Line under deposit scheme under EDSD- Kosi in the jurisdiction of E.D.D.-IInd, Kosikalan, Mathura
2022_DVVNL_703288_1
85/EDC-I(M)/2021-22
Open Tender
Electrical Works
Item Rate
180 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
DVVNL Agra
₹2,000
Yes
29 Aug 2022
26 May 2022
10 Jun 2022
26 May 2022
10 Jun 2022
26 May 2022
Amount
Carriage of 8.5 Mtrs. long PCC pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 9/11 Mtrs. long ST pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
Carriage of 11 KV XLPE Cable size 3x70/95 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
Carriage of 10/16/25 KVA Distribution Transformers from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
Replacement of 8.5 Mtrs. Long damaged PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work.
Erection of single pole structure on 8.5 Mtrs long PCC Pole including fitting of all relevant accessories as per RESPO norms.
Erection of single pole structure on 9/11 Mtrs long ST Pole including fitting of all relevant accessories as per RESPO norms.
Dismantling of existing damaged Double Pole structure on 8.5/9/11 Mtrs. long PCC/ST pole by opening all relevant accessories.
Erection of Double pole structure on 8.5 Mtrs. long PCC pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure on 9/11 Mtrs. long ST pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Installation of stay set with grouting and Nuzzling etc. as per RESPO drawing /norms along with all routine material to be used for such works.
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasel conductor in 11 KV/ LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Dog/Raccon conductor in 11 KV/33KV lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x50 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x95 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying, sagging and stringing and jumpering / binding etc. of AB Cable 1x16 +1x25 sq mm. as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Mounting of 10/16/25 KVA Distribution Transformers on the erected pole including cabling and jumphring.
Laying of 11 KV XLPE Cable size 3x70/95 sq.mm. on single pole structure for proper completion of work as per direction of supervising engineer.
Installation of 11 KV CT/PT Combined metering unit on existing double pole structure of large & heavy, power consumers to avoid possibility of theft of energy & 11 KV feeders at 33/11 KV sub- station including the cost of accessories (Nut & Bolt, PVC Tape etc.) required for proper completion of work also provided by the contractor. (including carriage of New 11 KV CT/PT combined metering unit from Store Center Mathura to Site of work.)
Fixing of meter pilfer box (service connection meter holding capacity) including its carriage from Electricity Store Centre Mathura to site of work including grouting of meter pillar box in ratio 1:4:8 cement, sand and brick ballast as per standard norms.
Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.
Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of supervising engineer.
Straightening of 8.5/9 Mtr. Long PCC/ST/Rail Pole tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.
Construction of T pole/ Section pole for 11KV/LT Line on the erected/new pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labor, T&P & Grouting etc. required for proper completion of work
Chopping of Tree branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc.
M/s S. S. Construction
Shri Krishna Construction Company
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .