Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L2₹87,051−₹7.9 L (90.1%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
12 Aug 2021, 4:00 pmClosed
Executive Engineer Division No-IHPPWD Shimla-3
Executive Engineer Division No-IHPPWD Shimla-3
C/O link road from Mashobra Chowk to Balika Ashram km. 0/00 to 0/430 SH Providing and laying G-III Bitumen macadam and Tarring with 25mm thick Bitumen concrete
2021_PWD_50797_2
SD-I-CTR_Tender-8111 dt 28-07-2021
Open Tender
Civil Works
Item Rate
30 days
Shimla
As per SBD
15 documents required · 15 mandatory
₹350
₹17,000
19 Jul 2024
5 Aug 2021
13 Aug 2021
5 Aug 2021
12 Aug 2021
5 Aug 2021
Amount
WBM Grading -III : Providing, laying, spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming , stone screening /binding materials to fill-up the interstices coarse aggregate, watering and compacting to the required density Grading -III as per Technical Specification Clause 405. including carriage of materials, labour and equipments to various location of site of work through all modes of transportation in all leads, lifts and all incidental charges..By mechanical Means
Providing and applying primer coat with bitumen emulsion (SS-1) on prepaired surface of granular base including cleaning of road surface and spraying primer @0.70-1.0 Kg. Per square metremechnical means as per technical specifecation Clause 502. including carriage of material within all leads lifts and as per the direction of Engineer-in- Charge.
Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kilogram per square metre on the prepared granular surfaces treated with primer and cleaned with hydraulic broom as per techanical specification Clause 503 ( Five hundred three) including carriage of material with in all leads, lifts and as per the direction of Engineer-In- Charge.
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying 30mm (twenty five milimetre) thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour crushed aggregates of specified grading, premixed with bituminous binder @ 5.40 to 5.60 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.508 including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Satish Kumar Vij
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .