Tender Value
₹57.0 L
EMD Value
₹4.8 L
Closing Date
30 Jun 2026, 3:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
CHIEF ENGINEER, KMC
KMC Motijheel
Construction of RCC Nala and sump well From H/O Shivkarn Yadav to Park via Kali Mandir at Baktauripurwa in ward 87 under zone3
2026_NNKAN_1162983_1
336/AA-2/26-27
Open Tender
Civil Works
120 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,033
₹4.8 L
23 Jun 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in trenches for foundations pipes cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in a distance of 50 mtr. | 1 | cum | 170 | ₹170 |
| 2 | B- 1.5MTR TO 3MTR DEPTH | - | cum | 129 | - |
| 3 | Providing and Laying Cement concrete (1:4:8, 1cement: 4 fine sand: 8 Brick ballast nominal size 40 mm ) and curing complete, including cost of formwork in foundation and floors. | - | cum | 5,740 | - |
| 4 | Centering and shutring including cost of de- shutring and decentering at all level over height 3.5 m aditional height 1 mtr etc all work | 1,798 | sqm | 212 | ₹3,81,176 |
| 5 | RCC Work with cement concrete 1:1.5:3,1cement :1.5 coarse sand:3 stone Agregate excluding centring shutring reinforcment etc all completion of work.for raft foundation | 1 | cum | 7,590 | ₹7,589.24 |
| 6 | RCC Work with cement concrete 1:1.5:3,1cement :1.5 coarse sand:3 stone Agregate excluding centring shutring reinforcment etc all completion of work.for wall | 0.34 | cum | 8,600 | ₹2,884.37 |
| 7 | RCC Work with cement concrete 1:1.5:3,1cement :1.5 coarse sand:3 stone Agregate incuding all completion of work.for slab | - | cum | 8,720 | - |
| 8 | Mild steel or Iron in Reinforcement including all completion of work. | 0.8 | qtls | 7,200 | ₹5,757.93 |
| 9 | 230 mm thk Class - 150 Brick Work in (1:4 ) cement mortar in Super structure including supply of all Materials Labour and Tool & Plants etc,required for proper completion of the work. | 0.4 | cum | 7,500 | ₹3,000 |
| 10 | S/L of 300mm dia RCC hume pipe of NP-2 class ( light cluty) with collar joint with stiff mix of cement motar including all labour work | - | rmt | 1,392.7 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.10 MB
rccnalaffc2306ULBT2.pdf
Tender Documents • 6.23 MB
BOQ_2180105.xls
BOQ • 0.29 MB