| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 CrAccepted-AOC SCO NO 102 AMAR MARKET NEAR SEC 9 CHOWK KARNAL | KARNAL | KARNAL | HARYANA | ₹3.5 Cr | 1 | Accepted-AOC L-1 |
| 2 | 2₹3.5 Cr+₹6.3 L (1.81%)Rejected-Finance VPO BIGHANA TEHSIL ALEWA DISTT JIND | JIND | HARYANA | 126101 | ₹3.5 Cr+₹6.3 L (1.81%) | 2 | Rejected-Finance L-2 |
| 3 | 3₹3.6 Cr+₹9.7 L (2.80%)Rejected-Finance CHARKHI DADRI | CHARKI DADRI | HARYANA | 127022 | ₹3.6 Cr+₹9.7 L (2.80%) | 3 | Rejected-Finance L-3 |
| 4 | 4₹3.7 Cr+₹16.6 L (4.76%)Rejected-Finance DISTT KARNAL | KARNAL | HARYANA | ₹3.7 Cr+₹16.6 L (4.76%) | 4 | Rejected-Finance L-4 |
| 5 | 5₹3.7 Cr+₹21.8 L (6.25%)Rejected-Finance A 1 102 SUSHANT LOK II SECTOR 55 122011 | GURUGRAM | HARYANA | 122011 | ₹3.7 Cr+₹21.8 L (6.25%) | 5 | Rejected-Finance L-5 |
Tender Value
₹4.2 Cr
EMD Value
₹8.5 L
Closing Date
15 Nov 2023, 5:00 pmClosed
RISHI SACHDEVA
PD - II, Karnal
Construction of Boundary Wall around land procured by Civil Aviation Department for Extension of Karnal Airport.
2023_HRY_323955_1
202365A7E802 A2A0 4730 8BA3 77E179A5FFF6645BAR
Open Tender
Civil Works
Works
120 days
Karnal
3 documents required · 3 mandatory
₹15,000
₹8.5 L
Yes
13 Feb 2024
26 Oct 2023
16 Nov 2023
26 Oct 2023
15 Nov 2023
26 Oct 2023
Amount
[11.4.2]10 mm thick cement plaster 2. 1:3 (1 cement: 3 fine sand)
[11.93.1]Finishing walls with water proofing cement paint of required shade : 1. New work (Two or more coats applied @ 3.84 kg/10 sqm)
[34.29.1]GI barbed wire fencing 1. G.I Barbed Wire Fencing 1.2 Metre High Providing and fixing 1.2 metres high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40 mm x 6 mm placed every 3 metres centre to centre founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807
[34.29.2]GI barbed wire fencing 2. G.I Barbed Wire Fencing 1.8 Metre High Providing and fixing 1.8 metres high GI barbed wire fencing with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every 3 metres centre to centre founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
[6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete
[6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
[6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Sh. Amit Sharma Contractor
Rakesh Kumar Contractor
Rohit Kumar Contractor
ramp india buildcon private ltd
Sh. Sanjeev Jaswal
NARENDER MALIK
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .