Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC Q NO A 29 POWER CITY JAMNIPALI KORBA CG 495450 | KORBA | CHHATTISGARH | 495450 | ₹6.5 L Quoted ₹5.5 L | L1 | Accepted-AOC L-1 Bidder |
| 2 | L2₹5.7 LRejected-Finance HOUSE NO A 31 POWER CITY JAMSHEDPUR KORBA CHHATTISGARH 495450 | KORBA | CHHATTISGARH | 495450 | ₹5.7 L | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹5.8 LRejected-Finance WORD NO 03 RATAKHAR KORBA KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | ₹5.8 L | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹6.8 LRejected-Finance HOUSE NO 269 WARD NO 46 AYODHYAPURI JAMNIPALI KORBA CG 495450 | KORBA | CHHATTISGARH | 495450 | ₹6.8 L | L4 | Rejected-Finance Not L1 Bidder |
| 5 | L5₹7.0 LRejected-Finance BHAIROTAL SURAKACHHAR TEH KATGHORA KORBA CHHATTISGARH 495454 | KORBA | KORBA | CHHATTISGARH | 495454 | ₹7.0 L | L5 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | ANIRUDH KUMAR CHOUDHARY L1 | Vijay Chandra Jha L2 | M/S GOYAL GROUP L5 | RAMAS BUILDCON L4 | RAJA AGRAWAL L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. ALL KINDS OF SOIL | 35 | CUM | 40 ₹1,400 | 113 ₹3,955 | 150 ₹5,250 | 110 ₹3,850 | 91.14 ₹3,189.90 |
| 2.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 3.5 | Cum | 470 ₹1,645 | 815 ₹2,852.50 | 900 ₹3,150 | 700 ₹2,450 | 557.5 ₹1,951.25 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand(zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 3.5 | cum | 1,850 ₹6,475 | 2,850 ₹9,975 | 3,300 ₹11,550 | 3,000 ₹10,500 | 2,293.57 ₹8,027.50 |
| 4.00 | Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand ) | 21.74 | CUM | 3,200 ₹69,568 | 2,910 ₹63,263.40 | 3,900 ₹84,786 | 3,000 ₹65,220 | 2,358.38 ₹51,271.18 |
| 5.00 | Brick work with clay flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in :- Cement mortar 1:6 (1 cement : 6 coarse sand) | 47.6 | CUM | 3,200 ₹1.5 L | 3,460 ₹1.6 L | 4,500 ₹2.1 L | 3,100 ₹1.5 L | 2,937.68 ₹1.4 L |
| 6.00 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) | 502.14 | Sqm | 110 ₹55,235.40 | 101 ₹50,716.14 | 200 ₹1.0 L | 150 ₹75,321 | 107.78 ₹54,120.65 |
| 7.00 | White washing with lime to give an even shade : Old work (one or more coats) . | 3,717.74 | Sqm | 5 ₹18,588.70 | 4.15 ₹15,428.62 | 4.5 ₹16,729.83 | 6 ₹22,306.44 | 4.45 ₹16,543.94 |
| 8.00 | 6 mm cement plaster of mix : 1:3 (1 cement: 3 fine sand) | 230.64 | Sqm | 100 ₹23,064 | 101 ₹23,294.64 | 130 ₹29,983.20 | 135 ₹31,136.40 | 97.2 ₹22,418.21 |
| 9.00 | Supplying and spreading coarse aggregates of size 40 mm and down of crusher including all leads and lifts on floors of sub station yard as per direction of the Engineer In Charge | 255.86 | cum | 860 ₹2.2 L | 925 ₹2.4 L | 900 ₹2.3 L | 1,240 ₹3.2 L | 1,090 ₹2.8 L |
| 10.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - | - |
Tender Value
₹11.4 L
EMD Value
₹14,300
Closing Date
16 Jun 2025, 5:00 pmClosed
Staff Officer Civil SECL Korba Area
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG)
Repairing of boundary wall of Ghurdewa Sub Station including white washing of substations of Balgi and Ghurdewa and Surakachhar 3 and 4 Mine of Korba Area
2025_SECL_336958_1
SECL/GM/KA/C/e-Tender/25-26/43 Dt. 04.06.2025
Open Tender
Civil Works - Others
60 days
Office of General Manager SECL Korba Area
As per NIT
3 documents required · 3 mandatory
₹14,300
25 Mar 2026
5 Jun 2025
18 Jun 2025
6 Jun 2025
16 Jun 2025
6 Jun 2025
6 Jun 2025 - 9 Jun 2025
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. ALL KINDS OF SOIL
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand(zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Brick work with clay flyash brick F.P.S. (non modular), class designation 7.5 in foundation and plinth in cement mortar 1:6 ( 1 cement : 6 coarse sand )
Brick work with clay flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in :- Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
White washing with lime to give an even shade : Old work (one or more coats) .
6 mm cement plaster of mix : 1:3 (1 cement: 3 fine sand)
Supplying and spreading coarse aggregates of size 40 mm and down of crusher including all leads and lifts on floors of sub station yard as per direction of the Engineer In Charge
Total impact of GST for the purpose of CTC
Vijay Chandra Jha (BID ID -1159907)
RAJA AGRAWAL (BID ID -1159096)
RAMAS BUILDCON (BID ID -1159449)
M/S GOYAL GROUP (BID ID -1161099)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_349330.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_349330.xls
BOQ • 6.40 MB
Download all tender documents and submit your bid