Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance RUGUDIPADA BALANGIR ODISHA PIN 767001 | BALANGIR | ODISHA | 767001 | ₹8.5 L | L1 | Accepted-Finance Won the lottery |
| 2 | L2₹8.5 LRejected-Finance | ₹8.5 L | L2 | Rejected-Finance Loose the lottery |
| 3 | L2₹8.5 LRejected-Finance | ₹8.5 L | L2 | Rejected-Finance Loose the lottery |
| 4 | L2₹8.5 LRejected-Finance MALPADA BALANGIR BALANGIR ODISHA PIN 767001 | BALANGIR | ODISHA | 767001 | ₹8.5 L | L2 | Rejected-Finance Loose the lottery |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
23 Mar 2026, 5:00 pmClosed
SE, Bolangir R and B Division, Bolangir
O/o SE, Bolangir R and B Division, Bolangir
Building (Electrical) Work
2026_EICCL_127243_3
SE (R AND B) BGR/ 33/ 2025-26
National Competitive Bid
Electrical Works
365 days
Bolangir
Please refer tender document
3 documents required · 3 mandatory
₹4,000
₹8,500
Yes
12 Jun 2026
13 Mar 2026
24 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
13 Mar 2026 - 19 Mar 2026
CAMC of 4 Nos 200KVA & 2 Nos. 80KVA online UPS at 650 bedded Teaching Hospital Balangir. This CAMC includes 4 periodic preventive maintenance by authoriesed Vertiv Global Service factory trained customer Engineer. The above CAMC does not cover the consumabale items like Batteries, Capacitors,Switchgear, & Cooling fans. The subject CAMC had been devised to include (1) Guaranteed 24-Hour on-site response, 7 days/ week, 24 hours/ day, (2) All spare parts coverage (Except Exclusions), labour & travel coverage & unlimited Break Down calls, (3) Includes 100% labour and travel coverage 7 days/ week, 24 hours/ day, (4) Performed by VERTIV GLOBAL SERVICE factory trained Customer Engineers, (5) Covers upto Four Preventive Maintenance Services including all Breakdown calls (Excluding national holidays), (6) Battery Health check up 6.24X7 Service Availabilty at site by keeping Vertiv Technician at Site round the Year. Preventive Maintenance Service had been devised to include (1) Cleaning up of Unit, Visual Inspection to check any deformation, (2)Checking and Adjustment (lf needed) of Power parameters like input. Output, DC voltage & Current, (3) Checking and Adjustment (if needed) of Control parareters on different PCBs, (4) Tightness of all connection, if shut down possible, (5) Functional Checking up of Rectifier section and inverter section, functional Checking up of Static Switch Section, (6) With customer approval, perform operational test of the system including unit transfer and battery dscharge, (7) Install or perform Engineering Field Change Notices (FCN) as necessary
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_585073.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.43 MB
DTCN4.pdf
Tender Documents • 2.66 MB
BOQ_585073.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid