Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹1,942.85 (1.00%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
7 Sept 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_322815_8
2nd Call e-NIT No. 149 REW UDHAMPUR of 2026-27 Dated 29-08-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹3,880
8 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of sign board | 1 | No. | 3,000 | ₹3,000 |
| 2 | Earh Work in Bulk Excavation in all kind of soils disposal lead 50m and lift upto 1.5 m By manual means 30 % all kinds of soil | 33.6 | cum | 187.3 | ₹6,293.28 |
| 3 | Earh Work in Bulk Excavation in all kind of soils disposal lead 50m and lift upto 1.5 m By manual means 30 % Soft rock | 33.6 | cum | 392.8 | ₹13,198.08 |
| 4 | Earh Work in Bulk Excavation in all kind of soils disposal lead 50m and lift upto 1.5 m By manual means 40 % hard rock | 44.8 | cum | 1,128.75 | ₹50,568 |
| 5 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge. 30 All kinds of soil. | 7.8 | cum | 479.3 | ₹3,738.54 |
| 6 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge 30 % soft rock | 7.8 | Cum | 924.8 | ₹7,213.44 |
| 7 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. 40 % hard rock | 10.4 | Cum | 2,173 | ₹22,599.2 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 11.7 | Cum | 5,733.6 | ₹67,083.12 |
| 9 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 52 | Sqm | 286.35 | ₹14,890.2 |
| 10 | Carriages of sand | 4.9 | Cum | 796.34 | ₹3,902.07 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_1084404.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .