Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | ₹18.6 L | L1 | Accepted-AOC AMPERE INFRA DEPOSITED APS AND ISD. |
| 2 | L1₹18.6 LRejected-Finance | ₹18.6 L | L1 | Rejected-Finance Looser on lottery |
| 3 | L1₹18.6 LRejected-Finance AT BALIA PO CHHANIPUR SALEPUR DIST CUTTACK | CUTTACK | ODISHA | 752120 | ₹18.6 L | L1 | Rejected-Finance Looser on lottery |
| 4 | L1₹18.6 LRejected-Finance AT DUMDUMA KHANDAGIRI PO PS KHANDAGIRI BHUBANESWAR DIST KHORDHA ODISHA PIN 751019 | KHORDHA | ODISHA | 751019 | ₹18.6 L | L1 | Rejected-Finance Looser on lottery |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified due to other than L1 |
Tender Value
₹18.6 L
EMD Value
₹18,593
Closing Date
17 Mar 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS ELECT DIVISION, BHUBANESWAR
Construction of 25KVA S/S, with 11KV and LT line towards shifting of existing line and S/S from the allignment of the road for construction of PWD Road from R.D road to Halia Sahi road under MMSY Scheme at Banki under R.W. Electrical Section, Cuttack
2026_CERWI_126904_1
EERWELBBSR- 40/2025-26
Open Tender
Electrical Works
180 days
Cuttack
2 documents required · 2 mandatory
₹6,000
₹18,593
18 May 2026
6 Mar 2026
18 Mar 2026
6 Mar 2026
17 Mar 2026
6 Mar 2026
6 Mar 2026 - 17 Mar 2026
Part - A (a) :- Construction of 11KV line using 11Mtr long 160X152mm WPB Pole with 100mm2 AAAC = 0.120Km. (From point D to E as shown in the SLD-1) and with 80mm2 AAAC= 0.2Km with installation of 11KV line DP with AB switch arrangement = 01No. (As shown in SLD -2) and erection of 11KV line pole using 11Mtr long 160X152mm WPB Pole =01No towards shifting of existing pole (At point D as shown in SLD-4). 1. Cut point with 90 degree angle. WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG)
Top Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 2.3 mtr., 2no's Channel(GI) required =( 2x9.56x2.3)
Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required =(6x2.36x0.280)
Double Pole Belting Channel(GI) 75X40X4.8mm., 7.14KG/Mtr., each Channel(GI) length 1.66 Mtr., 4 no's Channel(GI) required=( 7.14x1.66x4)
50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 2.671 mtr.,4 nos Angle(GI) required = (4.5x2.671x4)
Danger Plate, 2 no's.
Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510)
H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)
(H.T. Stay set (Complete )
H.T. Stay Insulator Type-C
7/10 SWG Stay Wire 15kg /stay
(Gi Pipe Earthing 40mm. 3 Mtr. Long
50x6mm Flat(GI) for earthing, 2.36kg/mtr.,(2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 5x2.36
GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg)
Back Clamp for anticlimbing device 25X3mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3BoIt
Disc insulator (B&S) 70 KN polymer
WEDGE CONNECTOR FOR 100 SQMM.CONDUCTOR
POLYCARBONATE BIRD GUARD
GI Nut , Bolt & Washer of different sizes (12.261 Kg each DP without AB Switch)
Black Paint(GIS Numbering & Zebra Stripping)
Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background
Civil & Services Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.SCum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.
Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole)
Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole)
Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design
2.Cut point with 90 degree angle. WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.) (Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg.
Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 1.2 Mtr. 4 Nos. Chanel required = (4x9.56 x 1.2)
Fish Plate 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 16Nos. required = (16x2.36 x 0.280)
Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 0.306 Mtr. 4 Nos. Chanel required = (4x9.56 x 0.306)
Danger Plate 1Nos.
Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510)
G.I. Barbed wire / Anticlimbing device (3Kg /support)
Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510)
11 KV Pin insulator Polymer.
H.W. Fittings (B&S) 70KN 3 bolt
Disc insulator (B&S) 70 KN Polymer
Earthing of support (Coil type)
No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing.
WEDGE CONNECTOR FOR 100 SQMM CONDUCTOR
PoLYCARBONATE BIRD GUARD
HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair)
HT Stay set complete
HT Stay Insulator-Type C
7/10 (SWG) Stay wire 15kg/Stay
G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole)
Black paint (GIS Numbering and & Zebra Sripping)
Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background
Civil & Services Fixing of complete 11KV line complete Stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & Standard
Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr.
Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr.
3. 11 KV Pin Points With WPB WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.) (Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg.
11KV V Cross Arm GI (10.2 Kg Each)
Top bracket 100 x 50 x 6mm GI Channel (GI) (2kg each)
Danger Plate 1No. for each pole
Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510)
G.I. Barbed wire / Anticlimbing device (3Kg /support)
Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510)
11 KV Pin insulator Polymer.
Earthing of support (Coil type)
No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing.
G.I. nuts, Bolts & washer of different size (1.45Kg/ Pin Point)
100 mmsq AAAC
80 mmsq AAAC
Crimping type Midspan Compression Joint for 100 sq.mm AAA conductor
Crimping type Midspan Compression Joint for 80 sq.mm AAA conductor
Black paint (GIS Numbering and & Zebra Sripping)
Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background
PoLYCARBONATE BIRD GUARD
Civil & Service Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr.
Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr.
Installation of 25KVA, 11/0.23KV Sing/e pole moonfed S/S =01No.using 11Mtr long 160X152mm WPB Po/e fovrards shifting oF existing S/S (As shown in SLD - 5) WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.) (Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg.
Top Channel (GI) GI 100 x 50 x 6 mm 9.56 Kg / Mtr., each chanel length (3Mtr. 2Nos. Channel (GI) required (2 x 9.56 x 3)
Fish Plate (GI) 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 6Nos. required = (6x2.36 x 0.280)
Transformer mounting bracket (65 x 65 x 6mm) suitable for 16/10KVA 11/0.23 KV Transformer
AB Switch mounting Channel (GI) 75 x 40 x 4.8mm GI Chanel (3000mm long) 7.14Kg / Mtr., 2Nos. (Each 2 x 3.0 x 7.14 = 42.84 Kg)
Cantilever Support angle 50 x 50 x 6mm GI (1282 mm long) (4.5 Kg / Mtr. 2Nos.) (Each 2 x 1.282x 4.5 = 11.54Kg)
HG/DO Fuse mounting Channel (GI) 75 x 40 x 4.8 mm GI channel (2000mm long) 7.14Kg / Mtr., 2Nos. (Each 2 x 2.000 x 7.14 = 28.56 Kg)
25x3mm GI flat for earthing, 0.59kg/mtr., (2.5 x 7 Mtr. for mesh formation, 12 Mtr. for LA and 2.5 Mtr. for raising, 11Mtr. for AB switch, 2.8Mtr. for HG Fuse, 5x2 mtr.for DTR and Nutral, (1.3 + 4.5) mtr for DTR Body 0.500 Mtr for LTDB & AB Switch operating handle, 3 Mtr. for Fenching) Each 62.6 x 0.59 =36.93 Kg).
LT distribution Box with MCCB, Aluminium Busbar of single bay with kit kat fuse for 25KVA S/S
55mmsq All Alloy Aluminum Conductor (AAAC) covered conductor
2C x 16mm2 LT XLPE Cable (Armoured)
AB switch (11KV 200A 3 Pole 50 Hz)
HG Fuse (11KV 200A 3 Pole)
WEDGE CONNECTOR FOR 80 SQMM CONDUCTOR
PoLYCARBONATE BIRD GUARD
Disc insulator (B&S) 70 KN Polymer
H.W. Fittings (B&S) 70KN 3 bolt
11KV Lightning Arrestor 12KV-10KA (Station Class)
11 KV Pin insulator Polymer.
HT Stay set complete
HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair)
HT Stay Insulator-Type C
7/10 (SWG) Stay wire 15kg/Stay
GI pipe earthing 40 mm 3Mtr. Long
G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole)
G.I. Barbed wire / Anticlimbing device (3Kg /support)
Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 8No. = (8x 0.59 x 0.510)
Danger Plate 1Nos.
Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510)
Name plate
Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background
Black paint (GIS Numbering and & Zebra Sripping)
Civil & Service Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr.
Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr.
PCC ratio 1:3 :6 (M 10 Grade) for DSS Area (5x3x0.1) = 1.5 Cum (Per pole)
Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 (M-10 Grade) size (900 x 600 x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire stay insulator.
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe .
Laying of 2 Cx 16 mm2 LT PVC Cable
Supply of AL Lugs suitable for 16 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement.
SITC and Erection of GI Fencing with Gate
(PART-A (c):- Consfrucfion of LT line Using 9Mtr long 300Kg PSC Pole with 4CX50 + 1CX50 + 1CX16 mm2 ABC -- 1.07Km (34Nos Span) (From poinf B to - C -- 0.12Km as shown in SLD -1 + A to B = 0.45Km as shown in SLD - 3 + A to B (Double Circuit)= 0.2Km as shown in SLD - 4 + C fo D = 0.12Km as shown in SLD - 6) and 2X35+1X25 mm2 ABC = 0.19Km (6NOs Spart) (Proposecf 25KVA DT to existing po/e = 0.07Km. as shown in SLD - 5 + A to B = 0.12Km (as shown in Si.D - 6) with erection of LT pole using 9Mtr long 300Kg PSC po/e = Of/\/o (as shown in SLD -5). (LT Line with PSC Pole) 9Mtr. long PSC Pole 300 Kg.
LT Stay set complete
7/12 (SWG) G.I. Stay wire-Grade-2
LT Stay Clamp (1.4 kg / pair)
LT Stay Insulator
Pole clamp for Eye hook for (XLPE erial bunched cable)
Eye hook for (XLPE erial bunched cable 25-70mmsq)
Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq)
Suspension clamp with EYE hook for ABC
4C x50mmsq + 1C x50mmsq + 1C x 16mmsq (Street light) (LT AB Cable)
2C x35mmsq + 1C x25mmsq (LT AB Cable)
Insulated piercing connector, Type B main 50 to 150mmsq and Tap 50 to 150sqmm.
Earthing of support (Coil type)
No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing.
Danger Plate LT
Black Clamp for danger board plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No's. = (1x 0.59 x 0.510)
G.I. Barbed wire / Anticlimbing device (3Kg /support)
Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510)
G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole)
Black paint (GIS Numbering and & Zebra Sripping)
Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background
Civil & Service Fixing of LT complete stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG Metal with all labour and material (Excavation of earth will be done of size 500 x 500 x 1500mm.)
Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1500mm) =0.375 Cu. Mtr.
(PART-A (d):- Construction of Double Circuit LT line Using 11Mtr long WPB Pole with 4CX501CX501CX16 mm2 ABC 400m(with Double Ckt arrangement) (From point A to-B-02KmX2=0.40Km Km as shown in SLD-4 (LT Line with WPS Pole for double ckt arrangement 1. LT AB Cable line WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.) (Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg.
LT Stay set complete
7/12 (SWG) G.I. Stay wire-Grade-2
LT Stay Clamp (1.4 kg / pair)
LT Stay Insulator
Pole clamp for Eye hook for (XLPE erial bunched cable)
Eye hook for (XLPE erial bunched cable 25-70mmsq)
Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq)
Suspension clamp with EYE hook for ABC
4C x50mmsq + 1C x50mmsq + 1C x 16mmsq (Street light) (LT AB Cable)
Insulated piercing connector, Type B main 50 to 150mmsq and Tap 50 to 150sqmm.
Earthing of support (Coil type)
No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing.
Danger Plate LT
Black Clamp for danger board plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No's. = (1x 0.59 x 0.510)
G.I. Barbed wire / Anticlimbing device (3Kg /support)
Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510)
G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole)
Black paint (GIS Numbering and & Zebra Sripping)
Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background
Civil & Service Fixing of complete 11KV line complete Stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & Standard
Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr.
Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr.
(PART-A(e):- Line Protection Guarding for Road Crossing Guarding Channel 75x40x4.8 mm, 7.14 KG/Mtr., each channel length 3.5 mtr., 4 no's channel required =( 4x7.14x3.5) ( For Double Pole)
No-6 GI wire (0.192 kg/mtr.) for Main String
No-8 GI wire (0.131 kg/mtr.) for lacing
Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.)
Gi Pipe Earthing 40mm. 3 Mtr. Long
50x6mm GI Flat for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36
Civil & Service Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .
Part-A (f): Dismantalling materials Dismantling of 9/8 Mtr. PCC/Joist Pole
Dismantling/Removal of V Cross arm from pole
Dismantling of 11kV Pin Insulator with Pin
Dismantling of 11kV Disc Insulator with Hardware
Dismantling/Removal of MS Channel. from Double Pole Structure/pole
Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 16KVA including removal of HT/LT leads, earth connections and unloading by crane if required
Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 25KVA including removal of HT/LT leads, earth connections and unloading by crane if required.
Re-Installation, Testing and Commissioning of 11/0.4kV, 25kVA Single phase/3-Phase Distribution Transformer on existing structure as per TP Central Orissa Distribution Co. Ltd. specification including loading, unloading, shifting/transportation from site/tent upto 15KM, Testing of Transformer at Site. Scope of work includes jumpering/connection at HT and LT side & Earthing Connections.
Dismantling of ACSR/AAAC 34/55mm2 from overhead line
Dismantling of varous size of LT AB Cable
Dismantling of 11 kV/33KV GO/AB Switch/Isolator/DD fuse/fuse set
Dismantling of Lightening Arrester(LA
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_584055.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.72 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_584055.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid