| 1 | L1₹96.9 LAccepted-AOC | ₹96.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹98.2 L+₹1.3 L (1.33%)Rejected-AOC | ₹98.2 L+₹1.3 L (1.33%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Contrctor Registration Copy Not Submitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Contrctor Registration Copy Not Submitted |
| Sl No | Description | Qty | Unit | MRADHAKRISHNAN L4 | V BASKARAN L2 | KUBERAN CONSTRUCTION PRIVATE LIMITED L3 | OM MURUGA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF DRAINAGE INCLUDING HORIZONTAL FILTERS AT SRILANKAN REFUGES CAMP IN MOONGILOORANI IN MANGULAM PANCHAYAT | |||||||
| 2.00 | Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation | 1,680 | M3 | 160 ₹2,68,800 | 100 ₹1,68,000 Lowest | 131 ₹2,20,080 | 100 ₹1,68,000 Lowest |
| 3.00 | Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 240 | M3 | 6,200 ₹14,88,000 | 6,050 ₹14,52,000 | 6,093 ₹14,62,320 | 6,000 ₹14,40,000 Lowest |
| 4.00 | Centering, shuttering and strutting to the soffits of R.C.C slabs and beams including cost and conveyance of all materials to site etc., complete. | 4,800 | M2 | 552 ₹26,49,600 | 520 ₹24,96,000 | 548 ₹26,30,400 | 500 ₹24,00,000 Lowest |
| 5.00 | Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 551.99 | M3 | 6,365 ₹35,13,416.35 | 6,320 ₹34,88,576.8 | 6,365 ₹35,13,416.35 | 6,300 ₹34,77,537 Lowest |
| 6.00 | Plastering with CM 1:5 mix using 12 mm thick include all charges of cost and conveyance ect | 800 | M3 | 290 ₹2,32,000 | 250 ₹2,00,000 | 290 ₹2,32,000 | 220 ₹1,76,000 Lowest |
| 7.00Sub Estimate For Horizontal Filter | |||||||
| 8.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., SDR complete | 41.01 | M3 | 264 ₹10,826.64 | 260 ₹10,662.6 Lowest | 264 ₹10,826.64 | 260 ₹10,662.6 Lowest |
| 9.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 4.34 | M3 | 6,093 ₹26,443.62 | 6,000 ₹26,040 Lowest | 6,093 ₹26,443.62 | 6,000 ₹26,040 Lowest |
| 10.00 | supplying and centering shuttering including necessary supports etc | 5.4 | M2 | 555 ₹2,997 | 500 ₹2,700 Lowest | 548 ₹2,959.2 | 500 ₹2,700 Lowest |
Tender Value
₹99.8 L
EMD Value
₹99,760
Closing Date
28 Oct 2025, 3:00 pmClosed
The Block Development Officer (B.PT)
The Block Development Officer (B.PT),PANCHAYAT UNION MANAMADURAI
CONSTRUCTION OF DRAINAGE INCLUDING HORIZONTAL FILTERS AT SRILANKAN REFUGES CAMP IN MOONGILOORANI IN MANGULAM PANCHAYAT
2025_RDTN_615105_1
2025-26-MNM-CONST OF DRAINAGE WITH HORIZONTAL FILTER AT SRILANKAN REFUGE CAMP IN MANGULAM PANCHAYAT
Open Tender
Civil Works
Item Rate
180 days
PANCHAYAT UNION MANAMADURAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹99,760
Yes
27 Nov 2025
17 Oct 2025
28 Oct 2025
17 Oct 2025
28 Oct 2025
17 Oct 2025
Amount
CONSTRUCTION OF DRAINAGE INCLUDING HORIZONTAL FILTERS AT SRILANKAN REFUGES CAMP IN MOONGILOORANI IN MANGULAM PANCHAYAT
Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation
Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Centering, shuttering and strutting to the soffits of R.C.C slabs and beams including cost and conveyance of all materials to site etc., complete.
Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification
Plastering with CM 1:5 mix using 12 mm thick include all charges of cost and conveyance ect
Sub Estimate For Horizontal Filter
Earth work excavation for foundation in all soils and sub soils to full depth etc., SDR complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
supplying and centering shuttering including necessary supports etc
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:4(One cement and Five M.Sand), 20 mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
supplying and Filling ISS HBG 20 mm metal including all cost and conveyance of all meterials to the site etc
supplying and Filling ISS HBG 4 to 8 mm metal including all cost and conveyance of all meterials to the site etc
supply of Pvc pipes 110 mm Dia with all labour charges etc
supplying and fixing cuddapah slabs 50 mm Thick including all labour charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V BASKARAN (BID ID -1497544)
KUBERAN CONSTRUCTION PRIVATE LIMITED (BID ID -1497018)
MRADHAKRISHNAN (BID ID -1497610)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
TenderDocument.pdf
Tender Documents • 0.41 MB
BOQ_734910.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .