| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-AOC 1286 TOTA RAM KI DHANI JAISALMER RAJ 345001 | JAISALMER | JAISALMER | RAJASTHAN | 345001 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹23.0 L+₹1,974 (0.09%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹27.9 L+₹4.9 L (21.4%)Rejected-Finance 77 KAILASH PURI BIKANER RAJASTHAN PIN 334001 | BIKANER | RAJASTHAN | 334001 | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹28.7 L+₹5.7 L (24.9%)Rejected-Finance 521 DR K L ACHAL VANSHI COLONY JAISALMER 345001 RAJ | JAISALMER | RAJASTHAN | 345001 | L4 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | MARUDHARA CONSTRUCTION COMPANY L4 | GEMRARAMCONTRACTOR L1 | BHATI TRADERS L2 | M/S VISHNOI ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | M&L for pouring of elastomeric compound on runway/dispersal/taxi track etc all as per the following specification and as directd by Engr-in-Charge:-
(a) Cutting/Chipping of existing cracked concrete/Bituminous surface not less than 100mm wide and 40mm deep with concrete cutter in proper alignment, removing all loose concrete/dust etc by air blower and carefully cleaning the surface to receive new material.
(b) Appliying primer to old surfaces using pump sprayer or brush covering all the area as directed.make of primer RDL 942 or equivalent. The primer shall be allowed to dry before pouring the elastomeric compound.
(c) Pouring of elastomeric compound mixed with all ingradient and pouring the mix in the affected area trowelled to acheive grooved or textured finish including all necessary formwork all as directed and specified. Note :- (i) The rate shall be inclusive of providing masking tape at joints and formwork required if any at spalled joints edges
(ii) The quoted rate deemed to be inclusive of making good to disturbed joint filling around the area where material is applied
(iii) Removal of debris from the site as directed by Engr-in-Charge. | 30 | SQM | 16,000 ₹4,80,000 | 14,000 ₹4,20,000 Lowest | 14,200 ₹4,26,000 | 18,000 ₹5,40,000 |
| 2.00 | M&L for cutting existing loose patches/spalled edges/widening of existing cracks of concrete pavement in geometrical shapes to average depth of 20 to 25mm using diamond cutters operated with generator sets,cleaning the surface with air compressors and removal of debris all as specified and directed. | 20 | SQM | 15,000 ₹3,00,000 | 300 ₹6,000 | 90 ₹1,800 Lowest | 400 ₹8,000 |
| 3.00 | M&L for applying Epoxy mortar with following specification up to depth of 20 to 25mm & including primer @ 0.45Kg/Sqm.
Note:-
1. Araldite 250-100 part by weight (Rasine).
2. Araldite 140-50 part by weight (Hardner)
3. Quartz sand 10 No - 500 Part.
Note : -(i) The rate shall be inclusive of providing masking tape at joints and formwork required if any at spalled joints edges
(ii) The quoted rate deemed to be inclusive of making good to disturbed joint filling around the area where material is applied | 20 | SQM | 7,000 ₹1,40,000 | 3,000 ₹60,000 | 2,850 ₹57,000 Lowest | 3,000 ₹60,000 |
| 4.00 | M&L for Racking out of old existing sealant compound, back up rod of the existing Expansion joints by special tools like racker/cutting blades/machines , Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes over closed cell medium density, cross linked polyethylene foam backup rod of minimum 30 mm dia before pouring the sealant for complete length of the joint. Finally filled with polyurethane joint sealant (10 to 12 mm depth) over backup rod meeting the requirements mentioned in BS-5212, BS4254 and EN-141875-2003 with minimum movement accommodation factor MAF of+/- 30%. and Removal of debris from the site as directed by Engr-in-Charge. | 410 | Ten RM | 1,450 ₹5,94,500 | 1,400 ₹5,74,000 | 1,298 ₹5,32,180 Lowest | 1,800 ₹7,38,000 |
| 5.00 | M&L for Racking out of old existing sealant compound and back up rod of the existing Dummy joints by special tools like cutting blades/machines, widening of joints by 2 mm by using joint cutting blades of appropriate size straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes over closed cell, medium density, cross linked polyethylene foam backup rod of minimum 8 mm dia for complete length of the joint, over it to be filled with polyurethane joint sealant (10 to 12 mm depth) meeting the requirements mentioned in BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) of+!- 30%. and Removal of debris from the site as directed by Engr-in-Charge. | 509 | Ten RM | 1,150 ₹5,85,350 | 1,100 ₹5,59,900 Lowest | 1,129 ₹5,74,661 | 1,200 ₹6,10,800 |
| 6.00 | Racking out of old existing sealant compound and back up rod of the existing Construction joints by special tools like cutting blades/machines, widening of joints by 2 mm by using joint cutting blades of appropriate size straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil vegetation and other debris Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes over closed cell, medium density, cross linked polyethylene foam backup rod of minimum 12 mm dia for complete length of the joint, over it to be filled with polyurethane joint sealant (10 to 12 mm depth) meeting the requirements mentioned in BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) of+!- 30%.and Removal of debris from the site as directed by Engr-in-Charge. | 617 | Ten RM | 1,250 ₹7,71,250 | 1,100 ₹6,78,700 Lowest | 1,149 ₹7,08,933 | 1,350 ₹8,32,950 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
23 Sept 2025, 6:00 pmClosed
CWE (AF) Jaisalmer
HQ CWE (AF) Jaislmer
REPAIR TO JOINT FILLING EPOXY ELASTOMERIC OF ORA PTT DISPERSAL TAXI LINK FOR SOUTH LOOP AND NORTH LOOP IN TECHNICAL AREA AT AF STN JAISALMER
2025_MES_727959_1
80360
Open Tender
Civil Works
Item Rate
180 days
GE (AF) Jaisalmer
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (AF) Jaisalmer
₹60,000
9 Oct 2025
26 Aug 2025
24 Sept 2025
26 Aug 2025
23 Sept 2025
9 Sept 2025
Amount
M&L for pouring of elastomeric compound on runway/dispersal/taxi track etc all as per the following specification and as directd by Engr-in-Charge:- (a) Cutting/Chipping of existing cracked concrete/Bituminous surface not less than 100mm wide and 40mm deep with concrete cutter in proper alignment, removing all loose concrete/dust etc by air blower and carefully cleaning the surface to receive new material. (b) Appliying primer to old surfaces using pump sprayer or brush covering all the area as directed.make of primer RDL 942 or equivalent. The primer shall be allowed to dry before pouring the elastomeric compound. (c) Pouring of elastomeric compound mixed with all ingradient and pouring the mix in the affected area trowelled to acheive grooved or textured finish including all necessary formwork all as directed and specified. Note :- (i) The rate shall be inclusive of providing masking tape at joints and formwork required if any at spalled joints edges (ii) The quoted rate deemed to be inclusive of making good to disturbed joint filling around the area where material is applied (iii) Removal of debris from the site as directed by Engr-in-Charge.
M&L for cutting existing loose patches/spalled edges/widening of existing cracks of concrete pavement in geometrical shapes to average depth of 20 to 25mm using diamond cutters operated with generator sets,cleaning the surface with air compressors and removal of debris all as specified and directed.
M&L for applying Epoxy mortar with following specification up to depth of 20 to 25mm & including primer @ 0.45Kg/Sqm. Note:- 1. Araldite 250-100 part by weight (Rasine). 2. Araldite 140-50 part by weight (Hardner) 3. Quartz sand 10 No - 500 Part. Note : -(i) The rate shall be inclusive of providing masking tape at joints and formwork required if any at spalled joints edges (ii) The quoted rate deemed to be inclusive of making good to disturbed joint filling around the area where material is applied
M&L for Racking out of old existing sealant compound, back up rod of the existing Expansion joints by special tools like racker/cutting blades/machines , Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes over closed cell medium density, cross linked polyethylene foam backup rod of minimum 30 mm dia before pouring the sealant for complete length of the joint. Finally filled with polyurethane joint sealant (10 to 12 mm depth) over backup rod meeting the requirements mentioned in BS-5212, BS4254 and EN-141875-2003 with minimum movement accommodation factor MAF of+/- 30%. and Removal of debris from the site as directed by Engr-in-Charge.
M&L for Racking out of old existing sealant compound and back up rod of the existing Dummy joints by special tools like cutting blades/machines, widening of joints by 2 mm by using joint cutting blades of appropriate size straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes over closed cell, medium density, cross linked polyethylene foam backup rod of minimum 8 mm dia for complete length of the joint, over it to be filled with polyurethane joint sealant (10 to 12 mm depth) meeting the requirements mentioned in BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) of+!- 30%. and Removal of debris from the site as directed by Engr-in-Charge.
Racking out of old existing sealant compound and back up rod of the existing Construction joints by special tools like cutting blades/machines, widening of joints by 2 mm by using joint cutting blades of appropriate size straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil vegetation and other debris Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes over closed cell, medium density, cross linked polyethylene foam backup rod of minimum 12 mm dia for complete length of the joint, over it to be filled with polyurethane joint sealant (10 to 12 mm depth) meeting the requirements mentioned in BS-5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) of+!- 30%.and Removal of debris from the site as directed by Engr-in-Charge.
BHATI TRADERS (BID ID -3433366)
M/S VISHNOI ENTERPRISES (BID ID -3427062)
MARUDHARA CONSTRUCTION COMPANY (BID ID -3426732)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .