Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹68.7 LAdmitted-Finance | -0.10% | ₹68.7 L | L1 | Admitted-Finance |
| 2 | L2₹69.4 L+₹75,593.95 (1.10%)Admitted-Finance | +1.00% | ₹69.4 L+₹75,593.95 (1.10%) | L2 | Admitted-Finance |
| 3 | L3₹69.8 L+₹1.1 L (1.60%)Admitted-Finance 0 BELCHAURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 | MAU | UTTAR PRADESH | 275101 | +1.50% | ₹69.8 L+₹1.1 L (1.60%) | L3 | Admitted-Finance |
Tender Value
₹68.7 L
EMD Value
₹6.9 L
Closing Date
16 Jun 2026, 5:00 pmClosed
EO, NPP Baraut
NPP Baraut
01 - Kasba Baraut Ward No. 17 Dilip Vihar Kumhar gaddho mai Park ka nirman karya.
2026_DOLBU_1151407_1
89/2026-27, Dt. 02-05-2026
Open Tender
Miscellaneous Works
Percentage
180 days
Baraut
Tender Fee EMD and other documents as per tender documents/NIT
2 documents required · 2 mandatory
₹6,872
EO, NPP Baraut
₹6.9 L
25 Aug 2026
25 May 2026
17 Jun 2026
25 May 2026
16 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling 0f old brick work in cement mortar (s.i-692) | 0.2 | cum | 400 | ₹80 |
| - | Excavation in foundation in ordinory soil including lift up to 30.0m and including refilling ramming in comp.position (s.i-251) | 0.6 | cum | 90 | ₹54 |
| - | Earth work in filling with cartage 5.0km lead including royality in comp.position (as analysis) | 1 | cum | 203 | ₹202.98 |
| - | cc in (1:6:12) in foundation bed with 4cm gauge b/ballast cement c/sand in comp.position (s.i-273) | - | cum | 2,930 | - |
| - | M-150 Brick work in (1:5) mortar ,cement and c/sand in sub -structure including all material labour tools in comp.position (s.i-305 ) | 0.2 | cum | 4,440 | ₹887.56 |
| - | Rcc work in plinth beam in (1:1.5:3) mortar with cement and c/sand with approved stone grit in comp.position (s.i-289) | - | cum | 7,670 | - |
| - | Mild steel in rcc work in comp.position | 0.8 | kg | 85 | ₹67.99 |
| - | M-150 B/work in (1:4)mortar with cement and c/sand in super structure in comp.position (s.i-305A+310) | - | cum | 4,810 | - |
| - | 12mm thick plaster with cement and f/sand in (1:4) mortar including all material labour tools in comp.position (s.i-584) | 1 | sqm | 160 | ₹159.98 |
| - | M.s iron workin boundry wall railling in comp.position (s.i-502A) | 1 | qtl | 6,150 | ₹6,149.39 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
Tendernotice_2.pdf
PDF • 0.89 MB
Tendernotice_3.pdf
PDF • 1.12 MB
BOQ_2156703.xls
BOQ • 0.45 MB
Date_Extend.pdf
PDF • 0.18 MB
Date_Extend.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .