Tender Value
₹15.6 L
EMD Value
₹31,240
Closing Date
21 Jan 2021, 6:50 pmClosed
DFO MAHORE
DFO MAHORE HQ DHARMARI
CONSTRUCTION INSTALLATION CREATION OF 250 BOUNDARY PILLARS FOR DEMARCATION IN MAHORE AND GULABGARH RANGE OF MAHORE FOREST DIVISION UNDER CAMPA 2020-21
2021_FD_112941_3
NIT 06 OF 2020-21 DATED 01-01-2021
Open Tender
Civil Works
Item Wise
30 days
gulabh garh
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
DFO MAHORE
₹31,240
22 Jan 2021
16 Jan 2021
22 Jan 2021
16 Jan 2021
21 Jan 2021
16 Jan 2021
16 Jan 2021 - 20 Jan 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in all kind of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work upto plinth level 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) Crushed. Incl. all carriages lifts complete job.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal sizeIncl. all carriages lifts complete job.
Dumping of stones Incl. all carriages lifts complete job.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size.Incl. all carriages lifts complete job.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade: Bumble Bee 2014( Nerolac) Exterior Emulsion paint is recommended.
Centering and shuttering including strutting propping etc and removal of form work for columns, piers, abutments, pillars, posts and struts
Provsion for Repedite
Nasir Latief Butt
MS Shivam Constructions
Sunil Kumar
GULAM NABI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .