Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹12.7 LAccepted-Finance | ₹12.7 L | L2 | Accepted-Finance Accept |
| 2 | L3₹12.9 LAccepted-Finance | ₹12.9 L | L3 | Accepted-Finance Accept |
| 3 | L4₹12.7 LAccepted-Finance | ₹12.7 L | L4 | Accepted-Finance Accept |
| 4 | L4₹13.8 LAccepted-Finance | ₹13.8 L | L4 | Accepted-Finance Accept |
Tender Value
₹15.8 L
EMD Value
₹31,631
Closing Date
5 Aug 2026, 3:00 pmClosed
EE, SVPND, APWD, Sri Vijaya Puram
EE, SVPND, APWD, Sri Vijaya Puram
A/R and M/O Residential building under SVPND, APWD, Sri Vijaya Puram during 2026-27. SW_Minor repair and renovation of G-35 Type-IV Qtr at Goalghar under Deen Street Section, SD-I, SVPND, APWD, Sri Vijaya Puram
2026_APWD_23985_1
NIt No. 34/EE/SVPND/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Sri Vijaya Puram
Please refer tender documents
7 documents required · 7 mandatory
₹0
₹31,631
10 Sept 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
5 Aug 2026
31 Jul 2026
29 Jul 2026 - 4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | |||||
| 1.1 | Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | - | cum | - | - |
| 2Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. | |||||
| 2.1 | For thickness of tiles 10 mm to 25 mm | - | sqm | 1 | - |
| 3Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead : | |||||
| 3.1 | Up to 10 mm thick | - | sqm | - | - |
| 4Dismantling wooden flooring including screws etc complete as per direction of Engineer-in-charge | |||||
| 5 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | - | cum | 1 | - |
| 6Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 6.1 | All kinds of soil. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
TenderDocNIT34.pdf
Tender Documents • 1.18 MB
Instructions-to-bidders.pdf
Other Documents • 0.33 MB
BOQ_25417.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .