Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹13.7 L
EMD Value
₹13,700
Closing Date
18 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Commissioner, Coimbatore Corporation,Coimbator
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Renovation works to the corporation quarters at uppumandi street in ward no 80,central zone.
2026_MAWS_720698_12
e83/2026 CZ
Open Tender
Civil Works
Works
120 days
Coimbatore corporation-
As per Tender document
5 documents required · 5 mandatory
₹0
₹13,700
2 Nov 2026
2 Nov 2026
19 Nov 2026
2 Nov 2026
18 Nov 2026
2 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the damaged RCC as per directed by the departmental officers CCMC | 1 | Cu.m | - | - |
| 2 | Dismantling the damaged Plain cement concrete as per directed by the departmental officers | 1 | Cu.m | - | - |
| 3 | Dismantling the damaged brick work as per directed by the departmental officers | 1 | Cu.m | - | - |
| 4 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift - 10 m3 | 1 | Cu.m | - | - |
| 5 | Supplying and filling in foundation and basement withWell Gravel in layers of not more than 15 cm thick well rammed watered and compacted etc., complete complying with standard specification. | 1 | Cu.m | - | - |
| 6 | Conveyance of excavated earth and clearing away from site to a lead of 2KM from site etc., complete | 3 | Cu.m | - | - |
| 7 | Plain Cement Concrete1:4:8 (one part of cement, four part of Crushed Stone Sand (M-Sand) and Eight part of coarse aggregates ) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | Cu.m | - | - |
| 8 | Plain Cement Concrete1:2:4 (one cement, two Crushed Stone Sand (M Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 5 | Cu.m | - | - |
| 9 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc., including strutting 3 m high using mild steel sheets of size 90 cm X 60 cm X and B.G10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size10cm X 6.5cm (spacedat about 90 cmc/c)and supported dycasur in a props of 10 cm to13 cm dia (spacedof75cmC/C)complying with standard specification and directed- 10 m 2 (P & D) | 5 | Sq.m | - | - |
| 10 | Suppling and fabricating and placing in position MS (or)R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 1 | Qtl | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
TenderDocumentSingle.pdf
Tender Documents • 0.96 MB
BOQ_865608.xls
BOQ • 0.37 MB
ITB.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .