Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.1 LAccepted-AOC 000 SNEH RASHMI BHAWAN MAIN ROAD P O AKALTARA 495552 AKALTARA JANJGIR CHAMPA CHHATTISGARH 495552 | JANJGIR CHAMPA | CHHATTISGARH | 495552 | 1 | Accepted-AOC Technically and financially accepted as per NIT. | |
| 2 | 2₹23.5 L+₹1.4 L (6.21%)Rejected-Finance HARDI BAZAR DIST KORBA CG 495446 | KORBA | CHHATTISGARH | 495446 | 2 | Rejected-Finance Quoted higher rates. | |
| 3 | 3₹25.5 L+₹3.3 L (15.1%)Rejected-Finance MISSION HOSPITAL CHOWK KEDARPUR AMBIKAPUR DIST SURGUJA CG 497001 | SURGUJA | CHHATTISGARH | 497001 | 3 | Rejected-Finance Quoted higher rates. | |
| 4 | 4₹26.9 L+₹4.8 L (21.6%)Rejected-Finance RAILWAY COLONY PO DHANPURI DISTT SHAHDOL M P 484114 | DHANPURI | SHAHDOL | MADHYA PRADESH | 484114 | 4 | Rejected-Finance Quoted higher rates. | |
| 5 | 5₹30.7 L+₹8.6 L (38.7%)Rejected-Finance BHAGWAN NIWAS WARD NO 30 DADARKHURD DADAR NALLA KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | 5 | Rejected-Finance Quoted higher rates. |
Tender Value
₹51.6 L
EMD Value
₹64,500
Closing Date
25 Jul 2022, 5:00 pmClosed
SO ENM AHQ GEVRA AREA
ENM AHQ GEVRA AREA
Day to day shifting and installation of pumps at Bamhanpath, Bhatora, Godara patches main sump of Gevra project for a period of 365 days.
2022_SECL_247695_1
SECL/GM/GA/SO(ENM)/ E-TENDER/22-23/52
Open Tender
Miscellaneous Works
Item Rate
365 days
GEVRA PROJECT
Please refer Tender documents.
5 documents required · 5 mandatory
₹64,500
15 Nov 2022
27 Jun 2022
27 Jul 2022
27 Jun 2022
25 Jul 2022
28 Jun 2022
27 Jun 2022 - 21 Jul 2022
Amount
Laying and jointing of MS pipe 10” including loading, unloading, transportation and placement (Gas, welding electrode and MS nuts and bolt will be supplied by contractor
Laying and jointing of MS pipe 8” including loading, unloading, transportation and placement (Gas, welding electrode and MS nuts and bolt will be supplied by contractor
Dismantling of MS pipes 10” dia. including loading, unloading, transportation and placement (Gas will be supplied by contractor)
Dismantling of MS pipes 8” dia. including loading, unloading, transportation and placement (Gas will be supplied by contractor)
Installation/shifting of pump motor set base plates starter, power cable including dismantling, refitting of foot valve, NRV, sluice valves, suction pipes delivery pipes and adding of one MS pipe in suction/delivery
Fixing of valves (SV/NRV/FV/etc.) in MS pipe 10”/12” including transportation and placement
Flange welding work in MS pipe 8”/complete jointing work after necessary cutting with gas and welding works (Gas & welding electrodes to be supplied by contractor)
Flange welding work in MS pipe 10”/complete jointing work after necessary cutting with gas and welding works (Gas & welding electrodes to be supplied by contractor)
Flange welding work in MS pipe 12”/complete jointing work after necessary cutting with gas and welding works (Gas & welding electrodes to be supplied by contractor) NOTE Since the works are directly related with production and safety in the mine and that too on day to day basis and it is observed as per practical experiences, minimum a gang of 9 persons (03 skilled + 06 semiskilled) will be required on daily basis. The agency must have to maintain the deployment of manpower of 9 persons daily on monthly average basis and in case of any shortage of manpower(on monthly average of 9 persons daily) will have a proportionate deduction as per prevailing HPC wages from the payment/ billing amount of agency
Total impact of GST for the purpose of CTC
DINESH KUMAR
MS R.P. JAISWAL
KEDAR SINGH
m/s bhagwan saran and associates
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .