| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹389.4 CrAccepted-AOC S 2 TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD 500 037 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500037 | ₹389.4 Cr Quoted ₹438.2 Cr | L 1 | Accepted-AOC L1 |
| 2 | L 2₹455.2 CrRejected-Finance NCC HOUSE MADHAPUR HYDERABAD 500081 TELANGANA INDIA TELEPHONE 040 23268730 | ₹455.2 Cr | L 2 | Rejected-Finance High Tender Percentage |
Tender Value
₹380 Cr
EMD Value
₹1.9 Cr
Closing Date
14 Feb 2023, 3:00 pmClosed
The Chief Engineer, TWAD Board, Madurai
No. 1/1, Sambakulam, Ganesh Nagar, Opposite to MGR Bus Stand, Mattuthavani, Madurai 625007
Jal Jeevan Mission CWSS to 831 rural habitations in 6 Panchayat Unions of Tirunelveli District with river Tamiraparani as source
2023_TWAD_285421_1
CWSS to 831 Habs in Tirunelveli District - II Call
Open Tender
Civil Works - Water Works
540 days
Tirunelveli
As per Bid Document
2 documents required · 2 mandatory
₹0
₹1.9 Cr
Madurai
13 Oct 2023
2 Feb 2023
15 Feb 2023
2 Feb 2023
14 Feb 2023
7 Feb 2023
2 Feb 2023 - 6 Feb 2023
6 Feb 2023
Jal Jeevan Mission – CWSS to 831 rural habitations in 6 Panchayat Unions of Tirunelveli District with river Tamiraparani as source (Construction Period : 18 months and paid Maintenance: 60 months)-II call
CONSTRUCTION OF OFFTAKE WELL (3.00M DIA & 5.0M DEPTH) CONNECTING MAIN AND COFFER DAM
Construction of Collection Well cum Pump House
Supply,Delivery,Erection of vertical turbine pumpset at Booster sump at Malayadiputhur in Head works & WTP at Sinkikulam and 400 KVA Transformer .
Construction of Elevated Generator Yard at Headworks and Construction of Transformer yard at Head Works and WTP
Construction of Elevated pump Room of size 9 m x 6 m @ HW
Construction of Retaining wall at Head works and Compound wall 40 m x 40 m
Providing toilet room of size 2m x 2m, Plumbing arrangement and Electrical Arrangement in Head Works
WTP - 22.79 MLD - Construction of Aerator , Aerator Staircase, Raw water channel, Walkway from Aerator to Stilling Chamber, Stilling chamber, Raw water Measuring Channel, Walkway from from Flashmixer to Clariflocculator - 1Nos, Flashmixer -1Nos, Clariflocculator-1Nos, Clarified water channel -1Nos, Clarified combined water channel to Filter house , Filter house(5+1No of beds), Filter House Staircase, Chlorine Room (6m x 4m), Compound wall (150m x 150 m)
MECHANICAL ARRANGMENTS AND ELECTRICAL ARRANGMENTS AT TREATMENT UNIT 22.79 mld WTP.
Pipe connection works at Treatment work site
Construction of Recycling sump 1.00 LL, Clear water sump 7.50 LL & 2.50LL sump cum Pump house and 0.20 LL Sludge collection well
Wash water Tank 1.00LL capacity (12m staging)
Land Scaping and Gardening in Treatment Plant and Paver Block Road
Construction of Electrician Quarters and Watchman Quarters at Treatment Plant Site
Water supply and Sanitary arrangements at Filter house
Construction of Scada arrangements Monitoring Room at treatment Works (15 m x 9 m)
Lightning arrestor Arrangements
Pumping Main and Feedermain
Construction of Pipe carrying Bridge in Pumping Main
Construction of Supporting Pillars in Pumping Main and Feeder main
DI Flow rate Limit control Valve for Pumping main
Full Bore Electromagenetic Water Meter for MSR
Supply, delivery,erection and commissioning of Openwell wet type Submersible Pumpsets (Single Pumpsets )
Supply, delivery,erection and commissioning of Openwell wet type Submersible Pumpsets (Multi Pumpsets).
Construction of MSR 2 LL,6.50 &9.5 Capacity 16 m staging height in Radhapuram, Therku Valliyur and Pirandimalai
Construction of various capacities of Sumps in Nanguneri Union.
Construction of various capacities of Sumps in Radhapuram Union.
Construction of various capacities of Sumps in Valliyur Union.
Construction of various capacities of Sumps in Kalakad Union.
Construction of various capacities of Service Reservoirs in Tirunelveli District
Construction of Scada room and Pump Room Using M sand
Construction of Compound walls for sump in Radhapuram Union ,Valliyur union,Kalakad union and Nanguneri Union and MSR at Pirandaimalai and Therkku Valliyur (Using M sand)
Construction of Centralised SCADA Control Center-cum-SCADA Building, Car Shed cum Two wheelar shed with Driver's Rest roomin Tirunelveli Dist
Source Creation, Supply, delivery, erection and commissioning of clear water vertical wet type submersible pumpset, Borewell protection arrangements and Rain water Harvesting Arrangements at TWAD Madurai,
Inlet Pipe Connection to Proposed Sumps & MSR AND Existing SRs
Supply delivery and erection of Flow control valve
Supply, delivery, Erection and commissioning of Electro chlorinator ( based on common salt)
Pumping Main Feeder Main for Regrouping of CWSS
Construction of Infiltration well 4.50 m dia .and 6.00 m depth at Re grouping of CWSS to Ponnakudi, CWSS to 185 hab, CWSS to Moolaikarapatti & CWSS to Panagudi.
Connecting Main from Infiltration Well to Sump at Re grouping of CWSS to Ponnakudi, CWSS to 185 hab, CWSS to Moo
Construction of Pump Rooms at Re grouping of CWSS to Ponnakudi & CWSS to 185 hab - 4 Nos.
Construction of various capacities of Sumps at Re grouping of CWSS to Ponnakudi, CWSS to 185 hab, CWSS to Panagudi & CWSS to Nanguneri.
Construction of Compound wall at Re grouping of CWSS to 185 hab in 15 m x 15 m - 3 Nos.
Supply, delivery,erection and commissioning of Horizontal Spilt casing centrifugal pumpsets (Re grouping Pumpsets)
Supply,Delivery,Erection of vertical turbine pumpset at Head works (Re grouping Pumpsets)
Supply, delivery,erection and commissioning of Openwell wet type Submersible Pumpsets (Re grouping - Multi Pumpsets)
Supply, delivery,erection and commissioning of Openwell wet type Submersible Pumpsets (Regrouping - Single Pumpset )
Maintenance of the scheme for a period of 5 years
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid