| 1 | 1₹6.1 LAccepted-AOC A 2 62 ASHIRWAD APARTMENT PASCHIM VIHAR NEW DELHI | NEW DELHI | DELHI | 110001 | ₹6.1 L Quoted ₹6.3 L | 1 | Accepted-AOC Work order has been issued vide work order No. 11 dated 19.10.2023 |
| 2 | 2₹7.2 L+₹87,900 (13.9%)Rejected-Finance | ₹7.2 L+₹87,900 (13.9%) | 2 | Rejected-Finance Being L2 |
Tender Value
Refer Docs
EMD Value
₹12,888
Closing Date
10 Oct 2023, 3:00 pmClosed
A K Jain
Zonal Building, Narela, Delhi-110040
Development of cremation ground at Sec. 26, Rohini in ward No. 28 Shahbad Dairy in Narela Zone SH Consultancy Services for Soil Investigation and Structural Design
2023_MCD_169394_1
EE-Project/NZ/TC/2023-24/12/1
Open Tender
Civil Works
Item Rate
30 days
Rohini
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹12,888
18 Nov 2024
3 Oct 2023
10 Oct 2023
3 Oct 2023
10 Oct 2023
3 Oct 2023
Amount
Soil testing and Consultancy
Drilling of bore holes of 100mm to 150mm dia i/c providing labour material and machinery requied for carrying out soil testing for bearing capacity of soil complete as per direction of Engineer-in-Charge performing standard penetration test as per IS 2131-1981/ Taking disturbed and undistubed samples at every 0.75m interval upto 6.0mt. depth and 1.50m interval upto 6.0m depth or at change of strate as per relevant IS specification complete i/c drilling of all types of soil other than bouldes and rocky. Showing soil profile depth of water table, filled up soil, rocky strata etc. Net safe/allowable bearing capacity at a depth decided by Engineer-in-Charge preparation and submission of detailed Soil Investigation Report in Six Sets. For first 5 mtrs. Depths (5 nos. bore holes)
Drilling of bore holes of 100mm to 150mm dia i/c providing labour material and machinery requied for carrying out soil testing for bearing capacity of soil complete as per direction of Engineer-in-Charge performing standard penetration test as per IS 2131-1981/ Taking disturbed and undistubed samples at every 0.75m interval upto 6.0mt. depth and 1.50m interval upto 6.0m depth or at change of strate as per relevant IS specification complete i/c drilling of all types of soil other than bouldes and rocky. Showing soil profile depth of water table, filled up soil, rocky strata etc. Net safe/allowable bearing capacity at a depth decided by Engineer-in-Charge preparation and submission of detailed Soil Investigation Report in Six Sets. For additional depth beyond 5.00 mtr. (if required)
Carrying out Dynamic cone penetration test using standard apparatus upto the depth using standard apparatus upto the depth of 15.00mt. As given below:- GL-10.00 MT
Constutancy services for the structural desing and drawing for the "Development of cremation ground at Sec. 26 Rohini in ward no. 28 Shahbad Dairy in Narela zone", Carrying out structural design including earthquake resistant, design bar bending schedule including general layout plan drawings including site visit whenver required ......... Calculation NOTE:1. Any revision in detailed project report/ concept plan structural drawings/design/BOQ/Abstract of cost due to site constraints or otherwise shall be carried out by the consultant at his own cost as per direction of Engineer in charge & will provide detailed project report and 6 nos of sets of drawings & design alongwith soft copy. 2. The time period mentioned in the NIT is for submission of detailed project report/ concept plan, structural drawings/design/BOQ/Abstract of cost etc. However the time period of the consultancy will be period for the main project and extended period if any up to the completion of the project, nothing extra shall be payble to the consultant for any extended period of the construction work. (a) No extra payment will be made for supplying of corrected drawing as required by the Engineer in Charge (b) 60% payment will made on submission of detailed project report and 6 sets of the drawing/architectural drawings (c) 20% payment will made on completion of 1/4 work (d) 20% payment will made on completion of work (e)The consultant is required to make visit the site monthly or as requisitioned by Engineer-in-charge through written/verbal communication. In case visit is not done by the consultant, Rs. 5000 per visit shall be recovered from the bill (f) If any confusion/controversy/shortcoming is noticed in the detailed project report/design/concept plan and drawing/BOQ/Abstract of cost the consultant bound to remove the same, failing which actions as per enlistment rules/other relevent law/clause of the contract etc, will be initiated.
ALLIED ENGINEERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .