Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6.8 L+₹99,367.79 (17.0%)Admitted-Finance PATHARA ALIPUR ASKA | ASKA | GANJAM | ODISHA | L2 | Admitted-Finance | ||
| 3 | L3₹6.9 L+₹1.1 L (18.8%)Admitted-Finance AT COLLEGE SQUARE ASKA GANJAM | ASKA | GANJAM | ODISHA | 761110 | L3 | Admitted-Finance |
Tender Value
₹6.9 L
EMD Value
₹6,857
Closing Date
19 Jan 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer, NAC, Aska
Executive Officer, NAC, Aska
CONSTRUCTION OF KOTHAGHAR AT TOTA SAHI,WARD NO-15,ASKA
2026_ORULB_124187_6
ASKANAC/MSBY-08/2025-26
Open Tender
Civil Works - Buildings
Percentage
60 days
NAC, ASKA
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹6,857
Yes
5 Feb 2026
6 Jan 2026
20 Jan 2026
6 Jan 2026
19 Jan 2026
6 Jan 2026
Earthwork in In hard soil with initial lead and lift including rough dressing & breaking the clods of maximum of 7 to 5 cm. thick size leveling etc. Complete
Providing, supplying, filling in foundation and plinth with sand including watering and ramming with cost, conveyance, royalty, taxes of all materials with all labour, T&P etc., complete.
Cement concrete of proportion (1:3:6) in F&F using 40mm size bhg metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect .
Cement concrete of proportion (1:2:4) in F&F using 12mm size cb/hb chips of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect.
Supplying, fitting & placing uncoated HYSD bar reinforcement complete as per drawing and techinical specification with cost, conveyance of rod & binding, wire etc complete. (Data for 1 Mt.)
Fly Ash Brick work with Fly Ash Bricks of 23cm.x 11cm.x 8cm. size having crushing strength not less than 75 Kg/Cm2 in cement mortar (1:4) in superstructure including splays, cuttings, circular moldings, watering & curing for 7 days, cost, conveyance, taxes & royalties of all materials, labour with T&P etc. complete in all respect.
12 mm thick cement plaster (1:4) finished smooth to brick masonry after racking out joints including watering, curing including cost, conveyance, taxes, royalties & labour with T&P etc. complete.
Painting two coats with any approved plastic emulsion paint to interior wall surface including cost of all materials and labour with T&P etc complete in all respect.
Electricity and PH connection
Fixing of tiles in dadoos skirting & riser of steps on 12mm thick cement plaster 1:3 joined with neat cement slurry mixed with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance, taxes & royalties of all materials, labour with T&P complete in all respect.
Fixing of tiles in floors, Trades of steps & Landing over 25mm thick bed of cement mortar 1:1 jointed with cement slurry mixed with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance, taxes & royalties of all materials, labour with T&P complete in all respect.
Supply provide and installation of MS Gate and window complete as per market rate
R.C.C work of proportion M-20 in Plinth Bend & Column base etc. using 12 mm size hg chips of approved quality including rigid & smooth centering & shuttering, cost, conveyance, taxes, royalties of all materials, watering & curing for 28 days & cost of all labour with T&P etc. complete.
Labour for laying sub base with Qurry dust in layers not exceeding 100mm watering and compacting to PRR but including cost, conveyance of sub base materials etc.complete.A.R.Page-142 & Item no.8
R.C.C work of proportion M-20 in Slab etc. using 12 mm size hg chips of approved quality including rigid & smooth centering & shuttering, cost, conveyance, taxes, royalties of all materials, watering & curing for 28 days & cost of all labour with T&P etc. complete.
For sign board
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
08MSBYDTCN.pdf
Tender Documents • 3.14 MB
BOQ_574484.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .