Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-Finance | L1 | Accepted-Finance Being lowest bidder | |
| 2 | L2₹2.4 L+₹4,165 (1.75%)Rejected-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | L2 | Rejected-Finance Not being lowest bidder | |
| 3 | L3₹2.5 L+₹8,722 (3.67%)Rejected-Finance BHAGWATI NAGAR JAMMU | L3 | Rejected-Finance Not being lowest bidder |
Tender Value
Refer Docs
Closing Date
5 Oct 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
MID Jammu
Repair/replacement of worn out parts of 5 cusec x 10m head pumping unit no.2 along with allied works at LIS Manyal Brahmna and Gurah Pattan, Repair/replacement of worn out parts of 5 cusec x 15m head pumping unit no. 2 along with allied works at Old
2021_IFC_140987_1
MID/J/e-NIT/2021-22/81
Open Tender
Repair and Maintenance Works
Lump-sum
10 days
Manyal Brahmana
As per tender notice
7 documents required · 7 mandatory
₹200
Executive Engineer MID Jammu
Exempted
MID Jammu
9 Oct 2021
23 Sept 2021
6 Oct 2021
23 Sept 2021
5 Oct 2021
29 Sept 2021
23 Sept 2021 - 5 Oct 2021
28 Sept 2021
180 days
Amount
Repair/replacement of worn out parts of 5 cusec x 10m head pumping unit no.2 along with allied works at LIS Manyal Brahmna and Gurah Pattan
Decoupling of 05 cusec HC pump of unit no.2 at LIS Manyal Brahmna from the motor assembly and dismantling the pump from the base frame. Carriage of the dismantled 05 cusec HC pump set, to the nearest roadside, using manual labour, head load to nearest road side, loading in transport vehicle, carriage to the workshop in the mechanical transport for repairs. Repair to 5 Cusec split casing pump set at workshop by way of dismantling and extraction of damaged internal parts. Repair to the impeller by way of welding/brazing, machining, making key ways slots on the impeller and fitting of the same on the pump shaft. Job also includes providing of new pump shaft and fitting by turning, aligning, threading at ends and making of new keyways and its proper adjustment. Providing and fitting of new coupling pulley, bushes-2 Nos., new gland rings, new bearings as per sample, new studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, complete reassembling of pump set after carrying out necessary repairs. Shifting back to the LIS Manyal Brahmna after carrying out necessary repairs at workshop and then fitting/reinstallation at the base frame, coupling with the motor by making proper alignment and testing on partial/full load. Complete job including cost of material and labour charges etc. Job also includes Providing and fitting of new coupling nuts/bolts & rubber bushes. Complete job including cost of material and labour charges. Complete Job. Servicing/cleaning of 2 no.s choked foot valves 400 mm dia. of pumping units installed at L.I.S Gurah Pattan. The job includes extraction of foot valves from the Canal after disengaging from the suction pipes and cleaning of mud/silt from pipes and foot valves using special tools and tackles. Complete dismantling of foot valves and then providing/fitting of new washers cut to size, adjustment of flaps with repairs to hinges. Reassembling the foot valves along with suction pipes by providing/fitting of new rubber sheets and nuts, bolts etc. Complete job includes cost of material used and labour charges for skilled and semiskilled labour to be employed at site for execution of job including the out station charges etc. Complete job
Rebate on Old Parts
Repair/replacement of worn out parts of 5 cusec x 15m head pumping unit no. 2 along with allied works at Old Malpur
Decoupling of 5 cusec x 15m head HC pump of unit no.2 from the motor assembly and dismantling the pump from the base frame. Carriage of the dismantled 5 cusec pump set by using manual labour, head load to the nearest roadside, loading in transport vehicle, carriage to the workshop in the mechanical transport for repairs. Repair to 5cusec horizontal casing pump set at workshop by way of dismantling and extraction of damaged internal parts. Providing & fitting of new impeller in place of damaged one as per sample. Job includes repairs to pump shaft by way of welding, turning, aligning, threading at ends and making of new keyways and straightening of the same to proper size. Providing and fitting of new bushes-2 Nos., new gland rings, new bearings as per sample, new studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, complete assembling of pump set after carrying out necessary repairs. Shifting back to the LIS at old Malpur after carrying out necessary repairs at workshop and then fitting/reinstallation at the base frame, coupling with the motor by making proper alignment and testing on partial/full load. Complete job including cost of material and labour charges etc. C/job
Rebate on Old Parts
Repair/replacement of worn out parts of 5cusec x 10m head pump of unit-3 along with allied works at LIS Rathua
Decoupling of 05 cusec x 10m head Horizontal casing pump of unit no.3 at LIS Rathua from the motor assembly and dismantling the pump from the base frame. Carriage of the dismantled 05 cusec Horizontal casing pump set, to the nearest roadside, using manual labour, head load to nearest tractor road , loading in tractor trolley by manual labour again unloading and loading in the transport vehicle at main road near Gho Manhasan and carriage to the workshop for repairs. Repair to 5cusec x 10m head horizontal casing pump set at workshop by way of dismantling and extraction of damaged internal parts. Providing, turning, rethreading & finishing to accurate size of pump shaft as per specifications of old damaged pump shaft. Job includes repairs to impeller by way of brazing, machining, making key ways slots on the impeller and fitting of the same on the pump shaft. Providing and fitting of new bushes-2 Nos., new check nut, new gland rings, new bearings as per sample, new studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, complete assembling of pump set after carrying out necessary repairs. Shifting back to the LIS Rathua after carrying out necessary repairs at workshop and then fitting/reinstallation at the base frame, coupling with the motor by making proper alignment and testing on partial/full load. Complete job including cost of material and labour charges etc. C/job
Rebate on Old Parts
Repair/replacement of worn out parts of 5 cusec x10m head pumping unit no.1 along with allied works at LIS Kukerian
Decoupling of 5 cusec x 10m head horizontal casing pump of unit no.1 from the motor assembly and dismantling the pump from the base frame. Carriage of the dismantled 5cusec pump set by using manual labour, head load to the nearest roadside, loading in transport vehicle, carriage to the workshop in the mechanical transport for repairs. Repair to 5cusec horizontal casing pump set at workshop by way of dismantling and extraction of damaged internal parts. Providing, turning, rethreading & finishing to accurate size of new pump shaft as per specifications of old broken pump shaft. Job includes repairs to impeller by way of welding, machining, making key ways slots on the impeller and fitting of the same on the pump shaft. Providing and fitting of new bushes-2 Nos., new check nut, new gland rings, new bearings as per sample, new studs/bolts on it, applying sufficient amount of grease to avoid excessive wear and tear, gland packing as per requirement, complete assembling of pump set after carrying out necessary repairs. Shifting back to the LIS Kukerian after carrying out necessary repairs at workshop and then fitting/reinstallation at the base frame, coupling with the motor by making proper alignment and testing on partial/full load. Also providing & fitting of new CI coupling set by way of machining for keyway on either side of shaft (motor and pump side) as per sample by way of resizing of holes. Job also includes Providing and fitting of new coupling nuts/bolts & rubber bushes. Complete job including cost of material and labour charges etc. C/job Servicing/cleaning of 2 no.s choked foot valves 200 & 250 mm dia. of pumping unit No. 1 & 3 at L.I.S Kukerian. The job includes extraction of foot valves from the sump after disengaging from the suction pipes and cleaning of mud/silt from pipes and foot valves using special tools and tackles. Complete dismantling of foot valves and then providing/fitting of new leather washers cut to size, adjustment of flaps with repairs to hinges. Reassembling the foot valves along with suction pipes by providing/fitting of new rubber sheets and nuts, bolts etc. Complete job includes cost of material used and labour charges for skilled and semiskilled labour to be employed at site for execution of job including the out station charges etc. Complete job
Rebate on Old Parts
G S ENGINEERING WORKS
BEE AAR ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .