Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Vidyadharan Krishnan Nair L1 |
|---|---|---|---|---|
| 1.01 | Loading & unloading charges of all RCC ,REC pole above 8.0 Mts length | 228 | Per pole | 91,200 ₹91,200 Lowest |
| 2.01 | Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM (Above 8m pole) | 228 | Per pole | 1,14,000 ₹1,14,000 Lowest |
| 3.01 | Excavation of pole pit in Rocky area (cmmon to all size of poles) by blasting / Manual | 228 | Per pit | 2,50,800 ₹2,50,800 Lowest |
| 4.01 | Erection of RCC,REC,PSC pole above 8.0 Mts length by using Crane/manual | 228 | Per pole | 1,36,800 ₹1,36,800 Lowest |
| 5.01 | Loading & unloading charges of all RCC ,REC pole upto 8.0 Mts length | 29 | Per pole | 8,700 ₹8,700 Lowest |
| 6.01 | Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM (Up to 8m pole) | 29 | Per pole | 14,500 ₹14,500 Lowest |
| 7.01 | Excavation of pole pit upto 8.0 mts length by using JCB/Manual | 29 | Per pit | 11,600 ₹11,600 Lowest |
| 8.01 | Erection of RCC,REC,PSC pole upto 8.0 Mts length by using Crane/manual | 29 | Per pole | 13,050 ₹13,050 Lowest |
| 9.01 | Loading & unloading charges of RS joists 42" Pole | 6 | Per pole | 2,400 ₹2,400 Lowest |
| 10.01 | Transporting charges of RS joists 42" and above Pole and other associated materials from Road side to pole pit and vice versa up to 2 KM (Above 8m pole) | 6 | Per pole | 3,000 ₹3,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
14 May 2025, 2:00 pmClosed
superintending Engineer
TNEB/Nagercoil
Imp estimate for strengthening of conductor in HT line ACSR 7 3 35 and ACSR 7 2 59 change into ACSR 7 4 09 from Karikkadu SS II 100 KVA to Vanniyoor SS III 100 KVA in 11 KVA Palugal Feeder under Kaliyakkavilai Distribution Section C and I PKD in Ku
2025_EB_552732_1
KKEDC/ET-28 /25,dt.29.04.2025
Open Tender
Electrical Works
Works
90 days
O/o thesuperintending Engine
As specified in tender
3 documents required · 3 mandatory
₹0
₹25,000
Yes
10 Oct 2025
29 Apr 2025
15 May 2025
30 Apr 2025
14 May 2025
30 Apr 2025
30 Apr 2025 - 13 May 2025
Loading & unloading charges of all RCC ,REC pole above 8.0 Mts length
Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM (Above 8m pole)
Excavation of pole pit in Rocky area (cmmon to all size of poles) by blasting / Manual
Erection of RCC,REC,PSC pole above 8.0 Mts length by using Crane/manual
Loading & unloading charges of all RCC ,REC pole upto 8.0 Mts length
Transporting charges of all type of pole and other associated materials from Road side to pole pit and vice versa up to 2 KM (Up to 8m pole)
Excavation of pole pit upto 8.0 mts length by using JCB/Manual
Erection of RCC,REC,PSC pole upto 8.0 Mts length by using Crane/manual
Loading & unloading charges of RS joists 42" Pole
Transporting charges of RS joists 42" and above Pole and other associated materials from Road side to pole pit and vice versa up to 2 KM (Above 8m pole)
Excavation of RS joists 42"pole pit in Rocky area by blasting / Manual
Erection of RS joists 42" poles length by using Crane/manual
Fixing of 3Q X arm
Fixing of SQ X arm
Fixing of V X arm 3 .5 feet
Fixing of Taping Channel X Arm
Fixing of HT/LT 'TI' Fittings
Dismantling & Re-Erection of 3Q Xarm
Dismantling & Re-Erection of SQ X arm
Dismantling & Re-Erection of V Xarm
Dismantling & Re Fixing of HT/LT 'TI' Fittings
Fixing of HT Pin Insulater
Fixing of LT Pin Insulater
Fixing of HT Disc Insulater
Fixing of LT shackle
Fixing of Aluminium knob
Dismantling & Re Fixing of HT Pin Insulater
Dismantling & Re Fixing of LT Pin Insulater
Dismantling & Re Fixing of HT Disc Insulater
Dismantling & Re Fixing of LT shackle
Dismantling & Re Fixing of Aluminium knob
Dis & Redoing of S phase connection
Dis & Redoing of 3 phase connection
Dismantiling Re-Erection of 1*40 W tube light cmplete set
Street light switching point arrangement
Dismantling & Re-Erection of street light switching point arrangement
Excavation of stay pit of 4.5 depth
Erection of stay set complete
Dismantling and re Erection of stay set complete
Paving & Stringing of conductor 7/4.09 mm ACSR
Paving & Stringing of conductor of above 7/2.59 mm ACSR up to 7/3.35 mm ACSR
Dismantling & Stringing of conductor 7/4.09 mm ACSR
Dismantling & Re erection of conductor of above 7/2.59 mm ACSR up to 7/3.35 mm ACSR
Dismantling & Re erection of conductor up to 7/2.59 mm ACSR or other equivalent conductor
Dismantling of conductor up to 7/2.59 mm ACSR or other equivalent conductor
Erection 11kv single pole str icluding erection Dt complte without center suport (Excovection 0f pole pit, transporting of pole ,erection of pole ,excovection of stay bit and erection stay set 2nos, erections str meterieals, eretion AB switch,erection HG fuse set, str earthing, MCD box, Ht las Lt las, jumperings, painting, lt cable arrangement, danger board ,mass concreting and stay concreting ,of board standard )
Loadind & un loading of Distribution Transformer up to 100 KVA
Transporting of Distribution Transformer
Erection of Distribution Transformer up to 25 KVA
Set right of all sizes of leaning pole
Loading & unloading of line materials
Drilling / Less than 23mm holes per hole / Slatted holes of slotted holes
OrdinaryTree Clearance
Coconut Tree Clearance
Transporting of Line materials from stores to office /site
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .