Tender Value
₹3.9 L
EMD Value
₹7,700
Closing Date
7 Feb 2020, 6:00 pmClosed
XEN R AND B DIVISION UDHAMPUR
XEN R AND B DIVISION UDHAMPUR
BOQ
2020_PWDJK_91731_1
Fresh ENIT No. 103 of 2019-20 Dated 31-01-2020
Open Tender
Civil Works
Item Rate
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
Yes
XEN R AND B DIVISION UDHAMPUR
₹7,700
Yes
12 Feb 2020
1 Feb 2020
8 Feb 2020
1 Feb 2020
7 Feb 2020
1 Feb 2020
Amount
Earth work in excavation by manual means over areas (Exceeding 30 cm & upto 1.5 mtr. in depth, as well as 10 Sqm on Plan) incl. disposal of excavated earth upto 1.0 mtr for cutting edge, disposed earth is to be levelled and neatly dressed in All kind of soil
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -- All work upto plinth level 1:5:10 (1 cement : 5 coarse sand : 10 graded stone agg. 40 mm nominal size) Crushed incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -- All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone agg. 20 mm nominal size) crushed with 20% plums incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Providing & laying cement concrete in retaining walls, return walls, Walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto floor 5- level, excluding the cost of centering, shuttering & finishing. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone agg. 20 mm nominal size) crushed with 20% boulders. incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Dry Random Rubble masonry with hard stone in foundation & plinth using Nallah stone with bond stone incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Dumping stone including cost of stones in horizontal or level. incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Centering & shuttering incl. strutting , propping etc. and removal of form work for :-
Foundations, footings, bases of columns etc.
Retaining walls, return walls, walls (any thickness) including attached plasters, buttresses, plinth and string courses etc.
Providing and laying cement concrete flooring 50 mm thick with cement concrete 1:2:4 (1 cement :2 coarse sand: 4 graded stone aggregate 20 mm nominal size) crushed. incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
12 mm cement plaster of mix 1:6 (1 cement: 6 coarse sand). incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete
Filling available excavated earth (excl. rock) in trenches , plinth , sides of foundations etc in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering, lead up to 50 m & lift up to 1.5 m.
Hand packed stone filling in wire crates incl. cost of stone & wire crates size 6.00 m X1.20X1.20 incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete (Recovery rate of wire crates @ the prevailing stock rates +taxes if supplied by the department)
Providing and laying non-pressure NP3 class ( Heavy duty) 1000 mm dia RCC H.P with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement :2 fine sand ) including testing of joints ,Cost of pipes etc incl all carriage lead, lift, loading/ unloading/handling/ rehandling Complete ( Recovery rate of 8'-0" length pipe with collars @ Rs.10000+ Taxes each) if supplied by the department.
Om Parkash
Vijay Kumar
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .